Laserfiche WebLink
B. Existing Site Characteristics <br /> 11 . Copies of Any Studies <br /> Soils and geologic studies are currently being prepared <br /> for the subject site . Additionally, a market research <br /> report has been commissioned. Both of these reports should <br /> be available within the next four to five weeks . Copies of <br /> these reports will be provided to the County as soon as they <br /> are available. <br /> C. Project Characteristics <br /> 2 . Describe Any Site Alterations <br /> The farm implement storage facility and miscellaneous <br /> trees located at the southeast corner of the property will <br /> be demolished and removed. The property is virtually flat <br /> and therefore minimum on-site grading is anticipated. No <br /> cuts or fills will be necessary. Exact location of streets <br /> and house lots will be determined by Tracy' s zoning and <br /> planning process. <br />