Laserfiche WebLink
Stantec <br /> Status Report February 1009 <br /> Former ARCO Service Station No.443 <br /> March 13, 2009 <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of ARC, a BP Affiliated Company, for the express purpose <br /> stated above. Any re-use of this report for a different purpose or by others not identified above <br /> shall be at the user's sole risk without liability to Stantec. To the extent that this report is based <br /> on information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation. No other warranties, expressed or implied are <br /> made by Stantec. <br /> Prepared by* Reviewed by: <br /> Ro er Clark Brian Westhoff <br /> Geologic Project Specialist Geologic Consultant <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Approver: ��RE•ESSiooq�� <br /> y ,5 iP 2 <br /> Rukosky .E. C58 <br /> Managing Principal Engineer * EXP.1 112010 <br /> March 13, 2009 10 ctvty R��P <br /> FOFCAUE <br /> cc: Mr. James Barton, Regional Water Quality Control Board- Central Valley Region <br /> Mr. Sergio Morescalchi, ARC (Upload to Enfos) <br /> Upload to Geotracker <br /> ADDENDUMS <br /> Attachment A Stratus Temporary Remediation Data Package <br /> 443 Status Report 0902.doc 2 <br />