My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
2478
>
2900 - Site Mitigation Program
>
PR0541551
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 12:33:18 PM
Creation date
5/4/2020 12:18:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541551
PE
2965
FACILITY_ID
FA0023821
FACILITY_NAME
FORMER ARCO #443
STREET_NUMBER
2478
Direction
E
STREET_NAME
OAK
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14124023
CURRENT_STATUS
01
SITE_LOCATION
2478 E OAK ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�p 103330 Cameron Park Drive, Ste 550 <br /> Cameron Park, Callfornia 95682 <br /> (530)676-6004-Fax:(530)676-6005 <br /> March 6, 2009 <br /> Mr. Rusty Benkosky <br /> Stantec Consulting Corporation <br /> 3017 Kilgore Road, Suite 100 <br /> Rancho Cordova, California 95670 <br /> Re: Temporary Remediation Effort Data Package, BP Service Station No. 443, <br /> located at 2475 East Oak Street, Stockton, California. (Field activities performed <br /> on February 24, 2009) <br /> General Information <br /> Data Submittal Prepcu•ecl/Revietived b)): Levi Ford/ Steve Carter <br /> Phone Number: (530) 676-6008 <br /> Date: February 24, 2009 <br /> On-Site Supplier Representative: Levi Ford <br /> Scope of Work Peformed: Extracted a total of approximately 1,900 gallons of <br /> groundwater from monitoring wells MW-1S, MW-11), and MW-2S. <br /> Variations from Work Scope: None <br /> Unusual Field Conditions: Groundwater extraction began at 07:35. Well MW-ID was <br /> dry by 13:30, and extraction on this well was terminated in order to gauge the recharge <br /> rate in the well. Groundwater continued to be extracted fi:on well MW-1S and MW-2S <br /> until 15:02. <br /> This submittal presents the tabulation of data collected in association with interim <br /> remedial groundwater extraction. The attachments include field data sheets. The <br /> information is being provided to BP-ARCO's Scoping Supplier for use in preparing a <br /> report for regulatory submittal. This submittal is limited to presentation of collected data <br /> and does not include data interpretation or conclusions or recommendations. <br /> K:V3P-ARCO Esecutet443L009 Data packages\Areo_443_Fe609_Tnnp.Rentediatiun En'on_Dam Package.duc <br />
The URL can be used to link to this page
Your browser does not support the video tag.