Laserfiche WebLink
Stantec <br /> t anrt�erly Status Summary Report— Third Quarter 2011 <br /> Former ARCO Service Station No. 443 <br /> December 9,2011 <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of ARC, a BP Affiliated Company, for the express purpose <br /> stated above. Any re-use of this report for a different purpose or by others not identified above <br /> shall be at the user's sole risk without liability to Stantec. To the extent that this report is based <br /> on information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation. No other warranties, expressed or implied are <br /> made by Stantec. <br /> Prepared by: Reviewed by: <br /> Kimber Collins Catherine Francini <br /> Project Scientist Project Manager <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Approver:J� ��y40O 01_ GFo`o <br /> c'j ) BRIAN D. �� <br /> WESTHOFF <br /> Brian Westhoff, P.G. No.8784 <br /> Senior Geologist f� �� <br /> 9TFOF CAS\F�� <br /> December 9, 2011 <br /> cc: Mr. James Barton, Regional Water Quality Control Board - Central Valley Region <br /> Mr. Sergio Morescalchi, ARC, a BP Affiliated Company (electronic upload to Enfos) <br /> Upload to Geotracker <br /> 3 <br /> 443 QSSR 3Q11.doc <br />