Laserfiche WebLink
f January 6, 1999 <br /> F.1-anzia Brothers Winery <br /> n.� R6-excavation Work- F'la'n <br /> Page 3 <br /> ITEM S. TIME SCHEDULE <br /> The proposed "re—fFxcavc-ltion-' and remedial <br /> activities will be coordinated in three phases: <br /> Phase I: <br /> Phase I will it-sclude excavating contaminated soil from <br /> the tanFc location and placing material in a "secure" <br /> condition pending analysis and consideration of <br /> treatment. Work will begit'k within five (5) worF irig days <br /> after approval of the work plan. Sail analysis will be <br /> available to SJL.HD within a maximum of fifteen ( 15) day-, <br /> rotfrom date of sampling. <br /> Phase I I: <br /> Upon approval of the San Joaquin Local Health District. <br /> the excavation will be backfilled with clean material <br /> and compacted to merit specifiratior-Is of Frranzia Brothers <br /> Winery. The area will be repaved and put into service <br /> for parF;ing or driveway. <br /> Phase III: <br /> Upon aetermination of ,',pprc-priZA(t treattmerit grid when <br /> ambient temperature is conducive to effective treatment <br /> by aeration or biodegradation., permits will be applied <br /> for and treatment will commence. The sail will be <br /> treated Uritil acceptcble levels are at tR-.tined per Sal <br /> Jozquin Local Health District standards. <br />