My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
22107
>
3500 - Local Oversight Program
>
PR0545634
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
5/4/2020 12:48:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545634
PE
3528
FACILITY_ID
FA0007065
FACILITY_NAME
BENEFICIAL CALIFORNIA
STREET_NUMBER
22107
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
22107 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i.' <br /> JAR <br /> Client: G. R. Kause QCI# 1-95-314 <br /> Project: 22107 Hwy 120 - Sexton @ Hwy 120 - Escalon, CA Page: 2 <br /> SUMMARY OF LABORATORY TESTS <br /> I. Maximum Density and Optimum Moisture Determinations <br /> Test Method CAL 216 <br /> MAXIMUM OPTIMUM <br /> WET DENSUY MOISTURE <br /> MATERIAL NO. MATERIAL DESCRIPTION LOCATION LBS I FT__ PERCENT <br /> I Med. Br. Silty Sand/Sm Rock Import Soil 132.4 12.0 <br /> 2 Lt. Br. Silty Sand/Gravel Native Soil 141.7 9.1 <br /> 11 Field Density Test Results: <br /> DEPTH FIELD SPECIFIED <br /> BELOW FIELD RELATIVE RELATIVE <br /> FINISHED MOISTURE FIELD WET DENSITY DENSITY <br /> TEST APPROXIMATE GRADE MATERIAL PERCENT DENSITY COMPACTION COMPACTION <br /> NO TEST LOCA'T'ION INCHES NO WET WT LBS/FT %OF MAX % MAIC <br /> Tests taken in the Pit Backfill Area <br /> Date tested: 12/07/95 <br /> Native Soil <br /> 1 10'+ Below Finished Grade 0 - 8" 2 9.3 127.1 89.7 90 <br /> 2 8'+ Below Finished Grade 0 - 811 2 10.8 135.0 95.3 90 <br /> Import Soil <br /> 3 6'+ Below Finished Grade' 0 - 811 1 11.1119.7 90.4 90 <br /> 4 5'+ Below Finished Grade 0 - 8" 1 13.7 124.1 93.7 90 <br /> Tests taken in the Pit Backfill Area <br /> Date tested: 12/08/95 <br /> Import Soil <br /> I 4.0'Below Finished Grade 0 - 8" I NIA 119.9 90.6 90 <br /> 2 2.0'Below Finished Grade 0 - 8" 1 N/A 121.7 91.9 90 <br /> Native Soil <br /> 3 At Finished Grade 0 - 8" 2 N/A 128.8 90.9 90 <br /> The site preparatiarr, fill placement and campactin operations were completed by the time our field <br /> personae were called to the project site. In absence oontrrnrous observations by aur personnel at the site, <br /> this report does not express an opinion as to the adegrrac of the site preparation, or the uniformity off"' <br /> placement and compaction nor on the adequacy of the rl!to perform its intended function. <br /> We have employed acceptable engineering and testing procedures. We do not however, undertake the <br /> guarantee of construction nor do we relieve the contractor of his primary responsibility to produce a <br /> completed project conforming to the project plans, specifications mid applicable building codes. <br /> a• ���iildi� n�1fRl� �nslae{"m <br />
The URL can be used to link to this page
Your browser does not support the video tag.