Laserfiche WebLink
Quarterly Report _ First <br /> Bogetti's Orchard Service <br /> Stateuarter Zi]03 <br /> 2393 <br /> East ghway 132, 'Vernalis, California <br /> I RObUCTYON <br /> rAt the request of Nh `Albert B v <br /> quarterly report for the Bo ogetr �dvanced Ge"livtro <br /> Vernalis getti's Orchard Semce Station site located at 2 93 E has _`' '`f <br /> conducted dui is (Figure 1 p°rt Presents the results pghway tiers <br /> This re est Ttz <br /> la TAY 2002 ofground water rnonitormg acts tr s, <br /> The Purposes of the 4 <br /> `seasonal varzatror� quarterly ground ureter monztorzn . <br /> r hydrocarbon coin of elevation, gradient g program are to <br /> pounds ongroundu,ater bez,eath direction assess site ground water for <br /> 1 guzdelm s established , and to assess the impact of <br /> by file the site Thi report r petroleum <br /> Staffecomme,�datznns foYP�-egrn Water Quality Control Beard P epared accordance with <br /> dated 10 August 1990 <br /> y Investzgations and>z'valuatz(o of Underground <br /> Tia-Regional Board <br /> Presented zn A Background Information and <br /> ppendlx A previous site Investigation a�zvrt Tank Sites <br /> res axe { <br /> PROCEDURES <br /> On 17 January 2003 <br /> monitoring activities Includeund water xnonztoring w <br /> samples from each of the measurement of as Performed at the site The ' <br /> monrtorm ground water levels and collection of gro water <br /> monitoring event was g wells,llr_I through ' g ound w <br /> f <br /> Environment al hlealth Departmentsf armed in accord g &'W-5 (Table 1 ater <br /> arice with guidelines established by the SarlhJo aurid water <br /> (CVRW - 0rMe {EHD)and Central Valle <br /> Work Al�CB) and wez e performed in accordance wit1� the Y"Regional Water quire County <br /> dated 15 ApnI 1999 QualatyControlBoard <br /> , <br /> approved Prelzmana ' <br /> f <br /> �y Szte�4ssessmerxt <br /> 21 GROUND _ <br /> WATER DEPTH MEAS AND P <br /> + ° �AS <br /> a <br /> Ding the Tana t-TRGING <br /> �'Y 2003 Barri Irn� <br /> J0 9170und water rn P g event a Soltnst water level meter w� <br /> the moultorm used to <br /> groundwatermeasui g wells relative to the tops o f the well cas measure the depth <br /> new, dedicated ements were collected,c _ <br /> > disposable casing water In the monitorrn mgs After the depth-t, <br /> from each of the PolYethyIene brallers a g wells was evacuated using r <br /> monitoring wells e Approxiifnately nne'gallons ofwater were removed <br /> pH and conductFVlty of the guivalent to three casMg-water <br /> ' 4aktanwateranal P�'ged water Weare rneasur.ed atx guj�.vo�es per well Temperature, - <br /> " from t yzer Monitoring well field Io P ge-vol <br /> he site monitoring logs are included m A eine intervals with an <br /> g wells was contalned on-site zn PPeIIdIxB Pur e water <br />' app, <br /> labeled 55-gallon <br /> generated <br /> gallon drum, <br />