r <br /> HORIZON ENVIRONMENTAL INC. <br /> FIELD METHODS AND PROCEDURES <br /> SOIL GAS INVESTIGATION <br /> HYDRAULIC OR MANUALLY-DRIVEN SAMPLING PROBES <br /> The following section describes field methods ' and procedures that will be <br /> completed by Horizon Environmental Inc. (Horizon) personnel in performance of <br /> this project. <br /> 1.0 HEALTH AND SAFETY PLAN <br /> Fieldwork performed by Horizon and subcontractors at the site will be conducted <br /> according to guidelines established in a Site Health and Safety Plan (SHSP). <br /> The SHSP is a document that describes the hazards that may be encountered in <br /> the field and specifies protective equipment, work procedures, and emergency <br /> information. A copy of the SHSP will be at the site and available for reference by <br /> appropriate parties during work at the site. <br /> 2.0 UNDERGROUND UTILITY SURVEY <br /> Prior to commencement of work on site, Horizon will contact Underground <br /> Service Alert (USA) to set up an underground utility survey. USA contacts the <br /> owners of the various utilities in the vicinity of the site to have the utility owners <br /> mark the locations of their underground utilities. Work associated with borings <br /> and monitoring well installations will be preceded by manual hand augering to <br /> avoid contact with underground utilities. <br /> 3.0 SOIL GAS SAMPLING PROTOCOL <br /> Installation of probes rods and sampling for soil gas investigation will be <br /> performed under the supervision of a.Horizon geologist. All metal and non-metal <br /> tools and parts utilized during probe installation and soil gas sampling will be in <br /> good working condition, decontaminated or new, dedicated parts. A Post-Run <br /> Tubing (PRT) system consisting of a PRT expendable point holder, a PRT <br /> adapter and PRT Teflon or Nylaflow tubing will be used to insert, seal and <br /> convey soil gas from the target depth to the surface. The PRT expendable point <br /> holder will be driven into the ground using a truck-mounted Geoprobe® direct- <br /> push sampling rig or by an electric hammer ahead of as many 1.0-inches outside <br /> until it is advanced to the proposed <br /> diameter OD stainless steel robe rods u p p <br /> ( ) p <br /> target depth. The PRT adapter will be fitted at the end of a selected length of an <br /> inert 118 inch OD Nylaflow tubing approximately 5 feet longer than the embedded <br /> length of probe rods. The Nylaflow tubing will be fitted inside a protective, <br /> disposable, outer t/4 inch OD Teflon or polyethylene tubing and will be threaded <br /> down the center of the probe rods and connected to a sampling port just above <br /> the expandable (drop off) tip. <br /> Project No.7076.15 B - 1 HORIZON ENVIRONMENTAL INC. <br />