My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
3500 - Local Oversight Program
>
PR0545637
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 2:19:22 PM
Creation date
5/4/2020 2:12:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545637
PE
3528
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
02
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> l� <br /> A <br /> HorizoV Field Methods and Proceres <br /> 5.0 SPECIAL CONSTITUENT SAMPLING — TETRAETHYL LEAD <br /> i <br /> Battery-operated sampling pumps.will be pre-calibrated by the licensed analytical <br /> lab to extraction flow rate of 1 liter per minute (L/min). Dedicated sampling tubes <br /> containing resin mesh separated and contained by silylated glass wool plugs will <br /> be attached with flexible tubing to the intake end:of,the sampler pump and the <br /> opposite end of the tube will be broken and immediately attached to the '/4 -inch <br /> OD Nylaflow probe tubing. Sampling will proceed at the known flow rate for a <br /> calculated time interval to allow passing of a predetermined amount of soil gas to <br /> meet the required reporting limit qualification. The glass sample tube will be <br /> capped, securely packed and shipped under chain of custody to the licensed lab <br /> for analysis by NIOSH Method 2533. <br /> 6.0 BOREHOLE ABANDONMENT AND SURFACE RESTORATION <br /> After completion of sampling the hand-augered borehole shall be backfilled.from , <br /> total depth to surface with cement grout. The pavement surface shall be restored <br /> oto pre-existing conditions utilizing either cold patch for surrounding asphalt <br /> paving or quick-set cement tinted to match the surrounding concrete paving. <br /> i <br /> I <br /> Project No. 7076.15 B - 3 HORIZON ENVIRONMENTAL INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.