Laserfiche WebLink
t , nl 29,2002 <br /> . -2- <br /> Quik Stop Markets, Inc. MAY 0 6 2002 <br /> Claim No. 017043 <br /> UES <br /> COST PRE-APPROVAL BREAKDOWN <br /> Comments <br /> Task* Amount Pre-A roved <br /> ## $222 <br /> 1 pre-Field Activities $9,34I PID rental reduced to$104 Per <br /> day as per 2001 Fund Cost <br /> 2 Field Activities Guidelines. Optional concrete <br /> cutting Costs to be evaluated at <br /> time of reimbursement. <br /> $1,539 <br /> 3 Pro�ect Mana ement&Re ort $10,102 <br /> TOTAL PRE-APPROVED <br /> * Task descriptions are the same as those identified in Horizon Fnviro�nentals Apri129,2402-re�+ise cos <br /> estimate. <br /> roved at this time. The Fund will <br /> Only the tasks/costs reflected on the above table aro ed-amount to be determined if the <br /> review any tasks/costs that go beyond the pre-app <br /> if costs <br /> additional <br /> tasks and costs are necessary and reasonable. HO our Reirr�burs meabove <br /> nt Request. <br /> exceed the <br /> pre-approved amounts, the Fund will be unable to expedite y <br /> The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> y . becoines necessary,then you must request pre-approval of costs <br /> If a different scope of work <br /> oil the new scope of work. <br /> lthou h I have referred to the Horizon Environmental proposal in my pre-approval above, <br /> A g <br /> te of <br /> tifoi <br /> p <br /> lease be aware that you will be entering into a . Thi ate pr tapproaves to acostslas <br /> cannot compel you to sign any specific contract. <br /> resented in file revised proposal dated April 29, 204 l by Horizon <br /> Environmen <br /> November 2,12001, <br /> for <br /> p the Count for i rip <br /> conducting the work approved by Y <br /> 1-lorizon Environmental workplan- <br /> lained <br /> Please remember that it is still necessary to submit the actualosts are consistent witcosts of the work as h this pre- <br /> approval <br /> the Reimbursement Request Instructions �leaselir stlrethat <br /> tltat your consultantprepares their <br /> approval before you will be reimbursed. materials basis, that <br /> invoices to ittchtde the required breakdown of costsoil aand tltime aa�easortable explattations are <br /> invoiced tasks are conststettt wiNi the original proposal, <br /> P <br /> rovided for ally changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of a <br /> Caliloenia�nvironmenta/ProtecHorl Agency <br /> Co Recy,1ed Pnper <br />