Laserfiche WebLink
COMMENTS AND CONDITIONS <br /> 1 Obtain one cell installation permit from the Environmental Health Department(EHD) <br /> 2 Notify EHD at least 48 hours prior to the proposed scheduled work date <br /> 3 If contamination is found in soil or groundwater samples during the mstallanon and <br /> groundwater morutoring of NaV-1, then two additional monitoring wells must be installed <br /> to assess the lateral extent of impacted groundwater <br /> 4 The final screening inters al of 55 to 73 feet bsg may be adjusted based on soil sample <br /> composition to assure the screening of the more permeable soil <br /> 5 Laboratory anah-ncal results must be electronically submitted to GeoTracker--the State <br /> Water Resources Control Board database program <br /> DATED 05/09/03 BY <br /> cc C�, N QCB—James L L Barton <br /> tv�-onzon En%nronmental Inc —GaryD Barker <br /> • <br /> V <br />