Laserfiche WebLink
Gabriel Gonzalez [EH] <br /> From: William Little <wlittle@advgeoenv.com> <br /> Sent: Monday, January 26, 2015 2:27 PM <br /> To: Nuel Henderson [EH]; Gabriel Gonzalez [EH] <br /> Subject: 248 East Park St <br /> Attachments: CCW-Park Cross Section D-D' 2011 Figure 3 .pdf; CCW-Park VGWP SECTION .pdf; <br /> Canepa's Park Letter.pdf <br /> Mr. Nuel Henderson: As discussed the groundwater / soil vapor remediation has been ongoing at <br /> wells DPE-1, MW-18 over the past year. Whatever active well was under extraction, samples were <br /> regularly (monthly) collected to represent the influent concentration (e.i. MW-19 was sampled in the <br /> fourth quarter). <br /> Additional soil vapor was continually extracted from wells MW-18, MW-19, DPE1,2,3. <br /> AGE had proposed (in March 202) installation a single deep well for the vertical investigation on-site. <br /> The client had presented the work plan and attempted to continue to provide the information to <br /> completed a major data gap existing on the site. Will this plan be re-reviewed? <br /> William Little <br /> California Professional Geologist #7473 <br /> Advanced GeoEnvironmental, Inc. <br /> Environmental • Industrial Hygiene • Geotechnical • Contracting <br /> Phone: 800-511-9300 <br /> Fax: 888-445-8786 <br /> rmarty(a-)_advgeoenv com <br /> www.advqeoenv.com <br /> This email/fax message is for the sole use of the intended recipient(s) and may contain confidential <br /> and privileged information. Any unauthorized review, use, disclosure or distribution of this email/fax is <br /> prohibited. If you are not the intended recipient, please contact the sender by email/fax and destroy <br /> all paper and electronic copies of the original message. <br /> I <br />