Laserfiche WebLink
i <br /> Figure 7. <br /> 12,000 0 Benzene and Groundwater Elevation (GWE) in MW-5 versus Time 000 <br /> —D—MW-S Benzene <br /> —6 GWE for MW-5 <br /> sereen tap MW-5 -500 <br /> 10,0000 MW-5 Trendline <br /> -1000 <br /> 8,0000 <br /> y <br /> ,., <br /> -1500 w <br /> c <br /> 0 <br /> A d <br /> e <br /> 6,0000 -2000 w <br /> d <br /> a <br /> U <br /> -2500 <br /> 4,0000 .- ------ ------ - - - -- --- - - -- - - -- -- -- --- - --------- - - - - - - - - <br /> -3000 <br /> 2,0000 <br /> -3500 <br /> 0 0 -4000 <br /> DID <br /> Ir�p <br /> lip v 00 <br /> Time <br />