My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009571
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PARK
>
248
>
2900 - Site Mitigation Program
>
PR0542235
>
ARCHIVED REPORTS_XR0009571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 3:30:43 PM
Creation date
5/4/2020 2:34:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009571
RECORD_ID
PR0542235
PE
2960
FACILITY_ID
FA0024262
FACILITY_NAME
CANEPA CAR WASH
STREET_NUMBER
248
Direction
E
STREET_NAME
PARK
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
248 E PARK ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sit <br /> (Pacific <br /> History <br /> Canepa's Car Wash(Pacific Avenue) <br /> Page 4 of 7 <br /> 2001) and Sensitive Receptor Survey Report, dated August 16, 2001 The results indicated the presence of <br /> several domestic and municipal wells, two schools, three child-care facilities, and three LUST sites within <br /> the study area No apparent actively pumped drinking water wells were located within 500 feet of the site, <br /> however <br /> Condor performed additional groundwater investigation activities at the site consisting of three CPT <br /> borings, hydropunch sampling, and the installation of three soil borings and four monitoring wells <br /> Details of the investigation are presented in the Additional Soil and Groundwater Investigation Report <br /> dated January 21, 2002 Twelve monitoring wells, MW-1 through MW-12d, were surveyed as part of the <br /> investigation The new survey identified errors in the previously reported elevations of monitoring wells <br /> MW-6 and MW-7 The new survey elevations for these wells are higher than previously reported, and <br /> consequently, the groundwater elevation contours for the site no longer indicate a groundwater mound in <br /> the vicinity of monitoring well MW-2 The task of surveying the monitoring wells was sufficient to <br /> complete the Groundwater Monitoring Study Report dated February 13, 2002 <br /> Condor performed quarterly monitoring activities at the site on January 10, 2002 Laboratory analytical <br /> results of the groundwater samples indicated concentrations of petroleum hydrocarbon constituents that <br /> were consistent with historical data The analytical results also indicated substantial declines in <br /> contaminant concentrations in monitoring wells MW-I I and MW-12d compared to the initial laboratory <br /> analytical data collected from these wells in October 2001 <br /> The SVE system, modified to utilize two 1,000 pound vapor phase carbon vessels connected in series, <br /> was restarted on March 13, 2002 Vapor samples from the influent and mid tank locations were collected <br /> in Tedlar bags and submitted for laboratory analysis of BTEX constituents The system influent and <br /> effluent soil vapor flow rates and influent, mid tank and effluent soil vapor concentrations are measured <br /> weekly using a pitot tube and photoionization detector (PID), respectively Soil vapor samples from the <br /> influent, mid tank and effluent sample ports for laboratory analysis are collected quarterly <br /> Condor performed quarterly monitoring activities at the site on April 4, 2002 Laboratory analytical <br /> results of the groundwater samples indicated concentrations of petroleum hydrocarbon constituents that <br /> were consistent with historical data with the exception that concentrations of BTEX constituents generally <br /> declined in monitoring well MW-2, and low concentrations of benzene and TPH-G were detected in well <br /> MW-4 The analytical results also indicated declines in contaminant concentrations in monitoring wells <br /> MW-11 and MW-12d compared to the initial laboratory analytical data collected from these wells in <br /> October 2001 <br /> The SVE System was sampled for laboratory analysis on June 11, 2002 The concentration of the soil <br /> vapor was estimated using a correction factor derived from the results of the laboratory analytical results <br /> of soil vapor samples collected on June 11, 2002 and the concurrent PID measurements The PID <br /> measured soil vapor concentration multiplied by a correction factor of 0 84 provides an estimate of the <br /> soil vapor concentration as TPH-G During the June SVE sampling event, the mid tank soil vapor sample <br /> indicated concentrations of BTEX constituents, TPH-G and MTBE below the laboratory reporting limit, <br /> and therefore the destruction efficiency of the SVE system was estimated at 100% <br /> Condor performed quarterly monitoring activities at the site on July 1, 2, and 3, 2002 Laboratory <br /> analytical results for the groundwater samples collected from the monitoring wells were generally <br /> consistent with historical results The SVE well groundwater analytical results were generally consistent <br />
The URL can be used to link to this page
Your browser does not support the video tag.