Laserfiche WebLink
Site eHistory <br /> Canepa's Car Wash(Pacific Avenue) <br /> Page 7of7 <br /> generally consistent with historical data No constituents of concern were detected in the samples <br /> collected from monitoring well MW-9 and deep monitoring well MW-12D The concentration of MTBE <br /> detected in the sample collected from monitoring well MW-3 nearly doubled and was consistent with an <br /> increasing trend for that contaminant in that well The SVE system continued to be out of service for <br /> modifications and to accommodate property development Condor was conducting remediation project <br /> Planning/coordination/permitting and anticipated starting fieldwork in the spring of 2004 <br /> Condor conducted first quarter 2004 groundwater monitoring activities at the site on January 30, 2004 <br /> Monitoring wells MW-1, MW-2, MW-3, MW-4, MW-9, MW-11, and MW-12D and SVE well SV-4 <br /> were sampled and measured for water level during the event, consistent with the quarterly schedule <br /> Groundwater elevation data and laboratory analytical results were generally consistent with historic <br /> groundwater monitoring data The concentrations of MTBE and other gasoline oxygenates in MW-3 <br /> increased relative to historic data, consistent with the trend of increasing contaminant concentrations in <br /> that well Condor continued to conduct remediation system planning and permitting activities during early <br /> part of the first quarter of 2004 <br /> Condor conducted second quarter 2004 groundwater monitoring activities at the site on May 7, 2004 <br /> Monitoring wells MW-1 — MW-7, and MW-9 — MW-12D were measured for water level Monitoring <br /> wells MW-1, MW-2, MW-3, MW-4, MW-9, MW-11, and MW-12D and SVE well SV-4 were sampled <br /> during the event, consistent with the quarterly schedule Groundwater elevation data and laboratory <br /> analytical results were generally consistent with historic groundwater monitoring data The concentrations <br /> of MTBE and other gasoline oxygenates in MW-3 decreased relative to historic data Through the first <br /> quarter of 2004, the trend has been one of increasing MTBE concentrations in that well Condor <br /> continued to conduct remediation system planning and permitting activities during the second quarter of <br /> 2004 <br /> Condor conducted annual groundwater monitonng activities during the third quarter 2004 at the site on <br /> July 22 and 23, 2004 Depth to water measurements and groundwater samples were collected from <br /> monitoring wells MW-1 through MW-7, MW-9 through MW-12D and SVE well SV-4 Laboratory <br /> analytical results of the groundwater samples indicated that concentrations of petroleum hydrocarbon <br /> constituents were generally consistent with historical data Contaminant concentrations in the sample <br /> collected from MW-3 increased relative to the previous monitoring event and consistent with an <br /> increasing trend for MTBE in that well Groundwater elevation data indicated a northeast groundwater <br /> gradient generally consistent with historic groundwater gradients The SVE system continued to be out of <br /> service to allow for modifications to the system and property development, and has not been sampled <br /> since December 19, 2002 In a letter dated October 17, 2003, SJCEHD approved the RAP submitted by <br /> Condor dated March 3, 2003 Condor is currently conducting installation of the treatment systems and <br /> anticipates start-up of the systems in October 2004 <br /> • P 11000_pri11707 Canepa11707 Canepa-Pacific\Quarterly Monitonng12004 October\Canepa's SITE HISTORY doe <br />