Laserfiche WebLink
FIGURE 3 -HYDROGRAGH <br /> DATE(MONTH-YEAR) <br /> rn rn rn rn rn rn g' rn 4 g o o S q o 4 4 0 4 4 R o <br /> ¢ Q O O ¢0 LL � <br /> -5 <br /> -10 ----------------------------------------- ---- -- - ---------------------------------- <br /> J <br /> N -15 <br /> 0 Approximate elevation of top of well screen for <br /> Hmonitor wells MW 4 through MW 7 Well <br /> _20 <br /> ------------ ----------------------------------------------------- screen interval for MW 4,through MW7 <br /> W approximately 40 to eO feet BGS <br /> J <br /> W <br /> W <br /> W <br /> ----------------------------------------------------- ---------------------------------------------- <br /> a <br /> 0 <br /> z <br /> 0 -30 ---------------------------------------------------------------------------------------------------------- <br /> c� <br /> -35 ---------------------------------- ------------------------------- ----Approximateelevation of top of well screen for ----- ----- <br /> monitor wells MW f,MW 2 and MW 3 Well <br /> screen;nterval for MW 1 MW 2 and MW 3 <br /> approximately 45 to 65 feet BGS <br /> _qp <br /> BMW-1 X -MW-2 -0-MW-3 MW-4 MW-5 -&--MW-6 -BMW 7 <br /> CANEP NS CAR W ASH <br /> PARK STREET <br /> PROJECT NO 2038 <br />