Laserfiche WebLink
I <br /> FIGURE 3-HYDROGRAGH <br /> DATE(MONTH-YEAR) <br /> 7 LO LO OS d) n cc 07 O 0 T O O O N Nm O O ON O <br /> N <br /> CL 0 CL tu :3 .Q �i) U- O O -i Q O <br /> -5 <br /> �3 <br /> -15 — - --------__— �__ — -- <br /> 0 Approximate elevation of top of well screen for <br /> H monitor wells MW-4 through MW 7 Well <br /> -20 — - -_ __ screen interval for MW-0 through MW 7 - <br /> approximately 40 to 60 feet BGS <br /> W <br /> X <br /> W <br /> z5 - - - -- -- - - - - - -- -- - -- ------- - -- <br /> 3 <br /> v <br /> z <br /> O0L -30 - - - ---- -- --- -- -- - -- <br /> C7 <br /> -35 -- -— - — ---——- --- - - Approximate elevation of top of well screen for -monitor wells MW-1 MW 2 and MW 3 Well <br /> screen interval for MW 1 MW 2 and MW 3 <br /> approximately 45 to 65 feet BGS <br /> -40 - <br /> MW-1 <br /> 40MW-1 X MW-2 --0—MW-3 MW-4 MW-5MW-6 0 -MW-7 <br /> CANEPA`S CAR WASH <br /> PARK STREET <br /> PROJECT NO 2038 <br />