Laserfiche WebLink
I <br />' TABLE OF CONTENTS <br />' 1 INTRODUCTION .... .... .. ....... .. ... . .. .. .... ...... . .. ... ............................. ... . .. 1 <br /> 2 SITE BACKGROUND .. . . . .. .. .. ... . ......... ...... . . .. ......... ... ......... . ... ....... . . .... . 1 <br />' 3 QUARTERLY GROUNDWATER MONITORING—JULY 2001 . . .. . . ......... .. ... . .. . 1 <br /> 3 1 GROUNDWATER MONITORING OBSERVATIONS AND PARAMETERS 2 <br /> 3 2 GROUNDWATER SAMPLING 2 <br />' 4 GROUNDWATER MONITORING RESULTS . . .. . .. .. .. .. .. ... ....... ... . ... ........ ... . ... .2 <br /> 4 1 GROUNDWATER ELEVATION CONTOURS 2 <br />' 4 2 LABORATORY ANALYSES (TPH-G, BTEX, OXYGENATES/ADDITIVES) 3 <br /> 5 DISCUSSION OF RESULTS ........ . .. .. . .... ...... ...... . . ...... .............. .. ......... .. .... .4 <br />' 5 1 DISCUSSION OF GROUNDWATER ELEVATIONS 4 <br /> 5 2 DISCUSSION OF ANALYTICAL RESULTS 4 <br /> 5 2 1 DISCUSSION OF BENZENE CONCENTRATIONS 5 <br /> 5 2 2 DISCUSSION OF MTBE CONCENTRATIONS 5 <br /> 5 2 3 DISCUSSION OF OTHER ANALYTE CONCENTRATIONS 5 <br /> 6 RECOMMENDATIONS .. . . .. ................ .. ... ..... . . . ... ... .... .... ... ... .. ... . 6 <br /> LIST OF APPENDICES <br />' APPENDIX A <br /> Figure 1 Vicinity Map <br /> I Figure 2 Groundwater Elevation Contour Map—July 18, 2001 <br /> Figure 3 Hydrograph/Hydrograph Table <br /> Figure 4 MTBE Iso-concentration Contour Map—July 18,2001 <br /> Figure 5 Benzene Iso-concentration Contour Map—July 18,2001 <br /> Figure 6 Benzene and GWE in MW-2 versus Time <br /> Figure 7 Benzene and GWE in MW-5 versus Time <br /> Figure 8 MTBE and GWE vs. Time <br /> IAPPENDIX B <br /> Table A -Historical Groundwater Analyses (MW-1 through MW-7) <br /> Groundwater Monitoring Field Forms (MW-1 through MW-7) <br /> Groundwater Measurement Field Foran <br /> I APPENDIX C <br /> Certificates of Analyses (MW-1 through MW-7) <br /> Chain-of-Custody <br /> I <br /> I <br /> k <br /> �.1r CONDOR <br />