Laserfiche WebLink
' 15 March 2000 <br /> AGE-NC Project No 96-0229 <br />' Page 5 of 5 <br />' • Preparation of a Feasibility Study Work Plan to assess remedial alternatives for feasibility <br /> and cost to remediate the dissolved petroleum hydrocarbon plume at the site <br />' • Preparation of a Corrective Action Plan (CAP), the CAP should include results of any <br /> feasibility studies to determine appropriate remediation alternatives for the site A receptor <br /> survey should also be performed to locate potential receptors within 2,000 feet of the site, <br />' results of the receptor survey should be Included in the CAP <br /> • Continued quarterly ground water morntonng and sampling should be performed at the site <br /> in April 2000 <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based mainly <br /> upon analytical results provided by an Independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this Investigation are made from a limited number <br /> of available data points (e g ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or Implied, is made as to the professional <br /> recommendations contained In this report <br /> i <br /> IAdvanced GeoEmironmental,Inc <br /> i <br />