Laserfiche WebLink
s <br /> Advanced <br /> GeoEnvironmental, Inc, ; <br /> 4005 North Wtlaon Way,Stockton,Cd 95205• (209)467-1006+Far(209)467-1118 <br /> Monitoring Well Field Log <br /> Well Data <br /> x Project Name Pacific Car Wash Project No Date 1-21 -99 <br />' AGE-NC-0229 <br /> - Pre-Purge DTW IT Z1� Time ��iJS Well I D <br /> mw-3 <br /> 2-7- � <br />' Post-Purge DTW Time q,{ <br /> Total Depth of Well Ll 7. a Well Volume 7 Casing Diameter 2" 4" 6" <br />' r F / Gal/Ft 0 16 065 147 <br /> Sampler(s) M Rauser Sample Containers 4 VOA's <br />' Sample I D MW- 3 /1-21-99 Analysis TPH-g/BTEX/MTBE/8260 <br /> Stabilization Data <br /> Gond '� <br /> Time Volume pH Temp AZS/cm urbidiColorNotes <br /> (gallons) X Trbtdity <br /> 1 15 7 <br /> 10 q <br /> Z/ol <br /> Purge Method Purge Pump <br /> Sample Method Disposable bailer Well Integrity <br /> Sample Time 12 Dissolved O, <br /> ICM yda Hydac2 <br />