Laserfiche WebLink
TreaTek remobilized to the site on October 29, 1991 and continued the sampling activities The <br /> borehole at location RGS1 was extended to a total depth of 6 3 feet bgs at which depth an <br /> obstruction was encountered which would not allow advancement of the auger A field screening <br /> soil sample was collected at that depth <br /> The next location sampled was SGN1 This borehole was advanced to a total depth of 15 feet bgs <br /> ' with field screening samples collected at depths of 5 feet, 10 feet and 15 feet bgs Only the 15 foot <br /> depth sample from this location was kept for laboratory analysis <br /> Location SGN2 was the next borehole completed This borehole was advanced to a total depth of <br /> ' 11 feet bgs where a below ground obstruction was encountered which restricted the advancement <br /> of the auger Field screening samples were collected at depths of 5 feet and 10 feet bgs The 10 <br /> foot bgs sample was kept for laboratory analysis <br /> Location PL2 was the final borehole completed on October 29 199 <br /> 1 This le was advanced <br /> to a total depth of 10 feet bgs at which depth an obstruction was encountered owh ch would not <br /> allow advancement of the hand auger Field screening samples were collected at 5 feet and 10 feet <br /> bgs No analytical sample was collected from this borehole <br /> ' With the completion of the sample collection from borehole PL2, the boreholes RGN1 and RGN2 <br /> were reaugered to allow for grouting Premixed concrete was used to grout boreholes RGN1, <br /> RGN2, SGN1, PL2 and SGN2 All cuttings from the boreholes were containerized in 55 gallon <br /> drums onsite <br /> The sampling of the Pacific Car Wash site was completed p on November 4, 1991 The first location <br /> sampled was location SGS1 The borehole was advanced to a total depth of 15 feet bgs Field <br /> screening samples were collected at depths of 5 feet, 10 feet and 15 feet bgs The 15 feet bgs <br /> sample exhibited the highest OVA reading and therefore, was kept for laboratory analysis <br /> ' Location PL1 was sampled next This borehole was advanced to a total depth of 15 feet bgs with <br /> field screening samples being collected at depths of 3 feet, 5 feet, 10 feet and 15 feet bgs The <br /> 15 foot bgs sample exhibited the highest OVA reading and therefore was kept for laboratory <br />' analysis <br /> The final location sampled was Flt Again, this borehole was advanced to a total depth of 15 feet <br /> bgs with field screening samples collected at depths of 5 feet, 10 feet and 15 feet bgs The 15 foot <br />' bgs sample exhibited the highest OVA reading and therefore was kept for laboratory analysis <br /> Upon completion of the sampling activities, these boreholes were grouted closed to the surface with <br />' premixed concrete <br /> Following completion of each day's sampling period, the samples were stored in a refrigerated <br />' environment over night for delivery to the analytical laboratory the following morning Appropriate <br /> chain of custody documents accompanied each sample delivery The sample chain of custody <br /> recorrie aro 19`10 n.l •h ♦i <br /> YYlll1 Lit ara,yncai resuits in Appendix A <br /> r <br />