Laserfiche WebLink
r <br /> r10 May 2002 <br /> AGE-NC Project No 96-0229 <br /> rPage 5 of 5 <br /> A Feasibility Studies and Monitoring Well Installation Work Plan was submitted to the SJCEHD on <br /> 15 February 2002 and approved by the SJCEHD by letter on 15 March 2002, the scope of work <br /> included installation of one ground water extraction well, three soil vapor extraction(SVE)wells,one <br /> r in-situ air sparging well (IAS) and two ground water monitoring wells, performance of a 24-hour <br /> ground water aquifer pumping test, performance of an eight-hour SVE pilot test, performance of a <br /> 48-hour IAS pilot test and performance of a 24-hour SVE/IAS pilot test Upon pre-approval by the <br /> rUST Cleanup Fund, AGE will schedule field work with the SJCEHD <br /> r6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> renvironmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of available <br /> rdata points (e g ground water samples), and subsurface conditions may vary away from these data <br /> points No other warranty, expressed or implied, is made as to the professional interpretations, <br /> r. opinions and recommendations contained in this report <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> • <br /> rAdvanced GeoEnvironrnental,Inc <br /> r <br />