My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008059
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2900 - Site Mitigation Program
>
PR0542364
>
ARCHIVED REPORTS_XR0008059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 3:43:41 PM
Creation date
5/4/2020 3:16:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008059
RECORD_ID
PR0542364
PE
2960
FACILITY_ID
FA0024340
FACILITY_NAME
PACIFIC CAR WASH
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024014
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 November 2001 <br /> AGE-NC Project No. 96-0229 <br /> Page 6 of 6 <br /> 4.0. RECOMMENDATIONS <br /> Based upon the CPT investigation results during the 3rd quarter 2001, AGE recommends: <br /> ,w • Continued quarterly ground water monitoring; the next quarterly ground water monitoring <br /> event is tentatively scheduled for December 2001. <br /> • Conduct ground water pump testing at the site to obtain general aquifer characteristics such <br /> as hydraulic conductivity,transmissivity, storativity and drawdown at various pumping rates. <br /> Results of the pump test would be utilized to estimate a radius of influence for the zone of <br /> capture of dissolved petroleum hydrocarbons and to evaluate the feasibility of ground water <br /> extraction as a remedial option. <br /> • Install and continuously operate a ground water extraction system (interim remediation) in <br /> the area of MW-1 and MW-2 to inhibit further off-site migration of the fuel-impacted ground <br /> water plume. <br /> %W Installation of additional deep-screened ground water monitoring wells based on the findings <br /> of the existing shallow ground water monitoring wells and CPT soil borings; the screen <br /> intervals for the deep-screened monitoring wells will be placed to define and monitor the <br /> ... -..,Nor vertical extent of the ground water plume in each informal hydrologic unit. <br /> 5.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings were based mainly <br /> upon analytical results provided by an independent laboratory. Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points (CPT data and ground water samples), and subsurface conditions may vary <br /> away from these data points. No other warranty,expressed or implied, is made as to the professional <br /> recommendations contained in this report. <br /> V <br /> iw <br /> +� Advanced GeoEnvironmental,Inc. <br /> it <br />
The URL can be used to link to this page
Your browser does not support the video tag.