Laserfiche WebLink
1 <br />' Quarterly Report - First Quarter 2005 <br /> • PACIFIC CAR WASH <br />' 4405 Pacific Avenue, Stockton, California <br />' I.O. INTRODUCTION <br /> Advanced GeoEnvironmental,Inc (AGE)has prepared this quarterly report for 4405 Pacific Avenue <br />' (the site), Stockton, California The scope of work Included the performance of a quarterly ground <br /> water monitoring event and preparation of this report The objectives were to characterize, assess, <br />' and monitor concentrations of petroleum hydrocarbons in ground water and to characterize ground <br /> water flow direction and gradient at the site The site setting is Illustrated on Figure 1 Site structures <br /> and monitoring well locations are depicted on Figure 2 <br />' This report is prepared in accordance with guidelines Issued by the California Regional Water <br /> Quality Control Board - Central Valley Region (CRWQCB) for the investigation of underground <br />' storage tank(UST)sites A summary of previous investigations at the site was included in the AGE- <br /> prepared Feasibility Studies Work Plan, dated 15 February 2002, ground water monitoring data <br /> acquired to date is included in the tables of this report <br />' Previous soil characteristics data obtained by Cone Penetrometer Testing (CPT) and during soil <br /> boring/well drilling enabled AGE to define five Informal hydrogeologic units (Multi-Level <br />' • Monitoring Well Installation Report - Fourth Quarter 2003, dated 10 May 2004) The informal <br /> hydrogeologic units were defined as First Water Zone(15 to 45 feet bsg),First Confining Unit(45 to <br /> 70 feet bsg), Second Water Zone (70-95 feet bsg), Second Confining Unit (95-115 feet bsg), and <br /> Third Water Zone (115 to at least 125 feet bsg) <br /> 2.0. PROCEDURES <br /> On 04 and 05 April 2005, a ground water monitoring event was performed at the site on ground <br /> water monitoring wells MW-1 through MW-19, except for well MW-18 (A-E) due to a parked <br /> vehicle, construction details for each monitoring well are summarized in Table 1 Ground water <br /> monitoring procedures for the site were outlined in Work Plan Addendum, dated 11 April 2003, <br /> prepared by AGE and approved by San Joaquin County Environmental Health Department <br /> (SJCEHD) by letter dated 07 May 2003 <br /> 21 GROUND WATER MONITORING PROCEDURES <br /> On 04 April 2005,depth to ground water was measured in each well from the top of the well casing <br /> to the nearest 0 01-foot utilizing a Solmst water level meter The ground water elevation in each well <br /> was calculated by subtracting the measured depth to ground water from the surveyed casing <br /> i elevations (Table 2) Ground water elevations were plotted and contoured on a scaled site map <br /> i (Figure 3) <br /> Advanced GeoEnvrronmeotal,Inc <br /> I <br />