Laserfiche WebLink
I _ <br /> Quarterly Report - Third Quarter 2004 <br /> • PACIFIC CAR WASH <br /> I4405 Pacific Avenue, Stockton, California <br /> 1.0. INTRODUCTION <br /> Advanced GeoEnvironmental,Inc (AGE)has prepared this quarterly report for 4405 Pacific Avenue <br /> I (the site), Stockton, California The scope of work included the performance of a quarterly ground <br /> water monitoring event and preparation of this report The objectives were to characterize, assess, <br /> and monitor concentrations of petroleum hydrocarbons in ground water and to characterize ground <br /> water flow direction and gradient at the site The site setting is illustrated on Figure 1 Site structures <br /> and monitoring well locations are depicted on Figure 2 <br /> This report is prepared in accordance with guidelines issued by the California Regional Water <br /> Quality Control Board - Central Valley Region (CRWQCB) for the investigation of underground <br /> storage tank(UST)sites A summary of previous investigations at the site was included in the AGE- <br /> prepared Feasibility Studies Work Plan, dated 15 February 2002 , ground water monitoring data <br /> acquired to date is included in the tables of this report <br /> Previous soil characteristics data obtained by Cone Penetrometer Testing (CPT) and during soil <br /> . boring/well drilling enabled AGE to define five informal hydrogeologic units (Multi-Level <br /> I Monitoring Well Installation Report - Fourth Quarter 2003, dated 10 May 2004) The informal <br /> hydrogeologic units were defined as First Water Zone(15 to 45 feet bsg),First Confining Unit(45 to <br /> 70 feet bsg), Second Water Zone (70-95 feet bsg), Second Confining Unit (95-115 feet bsg), and <br /> Third Water Zone (115 to at least 125 feet bsg) <br />' 2.0. PROCEDURES <br /> On 29 September 2004, a ground water monitoring event was performed at the site on ground water <br />' monitoring wells MW-1 through MW-19, construction details for each monitoring well are <br /> summarized in Table 1 Groundwater monitoring procedures for the site were outlined in WorkPlan <br /> Addendum, dated 11 April 2003, prepared by AGE and approved by San Joaquin County <br /> Environmental Health Department (SJCEHD) by letter dated 07 May 2003 <br /> 2 i GDvv1 rL `TVATED iiivi'4.LX u�ivG PROCEDTTO wC <br /> On 29 September 2004, depth to ground water was measured in each well from the top of the well <br /> casing to the nearest 0 01-foot utilizing a Solinst water level meter The ground water elevation in <br /> each well was calculated by subtracting the measured depth to ground water from the surveyed <br /> casing elevations(Table 2) Ground water elevations were plotted and contoured on a scaled site map <br /> • (Figure 3) <br /> Advanced GeoEnvironmental,Inc <br /> I <br />