Laserfiche WebLink
® app/led Ge0sys/ems 41914 Power Inn Road, Sacramento,CA 95826 19161 452.2901 <br /> a FREMONT a IRVINE a HOUSTON • BOSTON + SACRAMENTO a CULVER CITY a SAN DOSE <br /> SITE SAFETY PLAN No. 30041-IS <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> ® at the <br /> ARCO Service Station No. 6100 <br /> 25775 South Patterson Pass Road <br /> Tracy, California <br /> (May 11, 1990) <br /> INTRODUCTION <br /> This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation. The provisions set forth in this Plan apply to the employees of Applied <br /> GeoSystems and its subcontractors working on this phase of the project. The subcontractors <br /> may elect to modify these provisions, but only to upgrade or increase the safety <br /> requirements, and only with the concurrence of Applied GeoSystems, as designated and <br /> accepted in writing. <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this project. Field activities are planned to begin pending approval of <br /> Work Plan by San Joaquin County. If changes in site or working conditions occur as <br /> activities progress, addenda to this plan will be provided by Applied GeoSystems. <br /> AUTHORITY FOR SITE SAFETY <br /> The Applied GeoSystems personnel responsible for project safety are the Paoject Manager <br /> and the Staff Geologist or Engineer. The Health and Safety Coordinator is responsible for <br /> the overall Applied GeoSystems Health and Saft.y Program and may choose to audit the <br /> site for compliance and take appropriate action to correct deficiencies. The Project <br /> Manager is responsible for implementing the provisions of this Plan, for providing a copy <br /> of this Plan to the Staff Geologist or Engineer, and for advising the Staff Geologist or <br /> Engineer on health and safety matters. The Project Manager and Staff Geologist or <br /> Engineer have the authority to audit site activities for compliance with the provisions of this <br /> Plan. They may suspend or modify work practices or dismiss subcontractors whose conduct <br /> does not meet the requirements specified in this-Plan. <br /> The Staff Geologist or Engineer is responsible for communicating the information contained <br /> s in this Plan to the Applied GeoSystems personnel assigned to the project and to the <br /> responsible representative of each subcontractor working for Applied GeoSystems on the <br /> project. <br /> m <br />