Laserfiche WebLink
Site Safety Plan May 11, 1990 <br /> ARCO Station No, 6100, 'Tracy, California AGS 30041-1S <br /> The Health and Safely Coordinator or Branch Safety Officer will explain Applied <br /> GeoSystems' Respiratory Protection Program to each new employee who must wear a <br /> respirator. The employee will be asked whether or not he or she understands the <br /> information provided. If the Company physician has cleared the employee for respirator <br /> use and the Health and Safety Coordinator or Branch Safety Officer has checked the fit of <br /> the respirator then the employee will be issued a respirator. A written record is signed <br /> and dated by the employee and Health and Safety Coordinator or Branch Safety Officer <br /> and kept in the new employee's Safety Record. <br /> WoRK ZONES AND SECURITY MEASURES <br /> The Project Manager will call Underground Services AIert (USA) and the utilities will be <br /> marked before any drilling is conducted onsite and the borings will he drilled at safe <br /> distances from the utilities. The client will also be advised to have a representative onsite <br /> to advise us in selecting locations of borings with respect to utilities or underground <br /> structures. Applied GeoSystems assumes no responsibility for utilities not so located. The <br /> first 5 feet will be hand augered before any drilling equipment is cperated. <br /> Each of the areas where the borings will be drilled will be designated as Exclusion Zones. <br /> allowed into an Exclusion Zone. When it is practical and <br /> Only essential personnel will be <br /> 4 1 local topography allows, approximately 25 to 75 feet of space surrounding those Exclusion <br /> Zones will be designated as Contamination Reduction Zones. <br /> Cones, wooden barricades, or a suitable alternative will be used to deny public access to <br /> these Contamination Reduction Zones. The general public will not be allowed close to the <br /> work area under any conditions. If for any reason ih.e safety of a member of the public <br /> (e.g., motorist or pedestrian) may be endangered, wo.rk will cease until the situation is <br /> remedied. Cones and warning signs will be used when necessary to redirect motorists or <br /> pedestrians. <br /> EXPOSURE MONITORING PLAN <br /> It is not anticipated that project personnel exposure will exceed the TLVs or PELs of the <br /> materials;however,proper personal protective equipment will be worn while working at the <br /> site. In addition, the work area will monitored using a direct-reading combustible gas <br /> analyzer or an organic vapor meter to detect the concentration of the volatile hydrocarbons <br /> in the ambient atmosphere. <br /> If the lowest '1LV.or..PEL is consistently being.exceeded in the breathing zone, then a . <br /> respirator must be worn. If the concentration exceeds 1,000 parts per million (ppm), the <br /> use of a respirator is inappropriate and personnel must withdraw from the site. <br /> 12 <br /> �` AAP ed GWSYSM117e <br />