Laserfiche WebLink
6.4 Site Health and Safety Plan <br /> A site specific Site Safety Flan is included in Appendix B. The plan describes the basic <br /> safety requirements for the work at the work site. It is applicable to personnel of Roux <br /> Associates and to subcontractors of Roux Associates. Tile Roux geologist will be the site <br /> safety officer on-site. Personnel at the site will be briefed on the contents of the Site Safety <br /> i <br /> PIa-i before work begins. A copy of the plan will be kept at the work site and will be t <br /> E , <br /> available fvr reference by appropriate parties during the work. <br /> . w.. 7 <br /> .- 7.0 SUBMITTAL <br /> i <br /> r <br /> ti <br /> s A report will be prepared which summarizes data gathered during implementation of this <br /> Work Plan. The report will contain a description of field methods, laboratory procedures, <br /> laboratory reports and Chain-of-Custody documents. The report will also contain cross- <br /> . 6 <br /> sections and maps(as appropriate)to illustrate sample location and the extent of excavation. <br /> A draft repo;It will be prepared for ARCO for review and comments,prior to being finalized <br /> for submittal to the SJLHD. After all laboratory results are received, the final report will <br /> be submitted to the SJLHD within six weeks, <br /> F - <br /> ti I Laboratory analytical results and a sample location map will be provided to the SJLHD as <br /> soon as the data are available to expedite the installation of the new underground storage <br /> tanks. Along with the analytical results and the location map, ARCO will submit a letter <br /> cammittin to a date that a Soil Contamination Work Plan will be submitted. The oz <br /> 9 Doc#AR46767W.Li <br /> �. s <br />