My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012613
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0012613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:31:28 PM
Creation date
5/4/2020 4:20:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012613
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> F <br /> vironmental Investigation July 16, 1990 <br /> r vice Station No. 6100, Tracy, California AGS 30041-1 <br /> FIELD WORK AND METHODS <br /> AppIied GeoSystems conducted held work at this site in accordance with Applied <br /> GeoSystems' Site Safety Plan 30041-15 (May 9, 1990). Applied GeoSystemsstandard <br /> methods for held work are described in Appendix A. The geologist initiated Chain of <br /> -- Custody Records which accompanied the samples to the analytical laboratories. Copies of e <br /> those documents are in Appendix B. <br /> I <br /> Applied GeoSystems was at the site on June 6 through 8, 1990, to observe Wayne Drilling <br /> of Lincoln, California, drill rive 8-inch diameter soil borings (B-1 through B-S): The <br /> locations of the soil borings are shown on Plate P-2. <br /> i � I <br /> r The locations of the borings were selected using ARCO's Preliminary Tank Replacement <br /> Assessment guidelines described in our Work flan (Applied GeoSystems, May 15, 1990). <br /> Boring B-1 was drilled approximately 2-1/2 feet from the edge of the tank area near the fill <br /> 3 <br /> ends of the product tanks, boring B-2 was drilled on the southwest end of the existing tank <br /> cavity, and boring B-3 was drilled on the northeast end of the existing tank cavity. Borings <br /> B-4 and B-5 were drilled in the area proposed as the new tank cavity;boring B-4 was drilled <br /> in the north corner approximately 10 feet from the existing tank cavity, and.boring B-5 was <br /> drilled on the southwest side of the proposed area(Plate'P-2). <br /> u ,4pplsed GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.