Laserfiche WebLink
VW-3, VW-5, VW-6, and the domestic well In most of the other wells, the thickness of water in <br /> the well (if present at all)was not great enough to enter the bailer <br /> 3 Stratus started the two SVE systems in accordance with SJVAPCD authority to construct on <br /> March 9, 2004 <br /> 4 Upon systems start-up, Stratus conducted weekly site visits to conduct operation and <br /> maintenance and to collect required air discharge samples <br /> 5 Stratus compiled and evaluated the first quarter 2004 monitoring and sampling data <br /> 6 Stratus obtained encroachment permits from SJCPWD and Cal Trans to enable offsite drilling <br /> activities on Patterson Pass Road <br /> 7 Stratus oversaw the advancement of two offsite soil borings (B-39 and B-40) between February <br /> 17 and February 20, 2004 <br /> WORK PROPOSED FOR NEXT QUARTER(Second 2004) <br /> 1 Stratus will continue to remove floating product from well MW-1 on a weekly basis, monitor free <br /> product thickness in selected wells, and remove floating product when present <br /> 2 The next sampling event is tentatively scheduled for June 2004 Groundwater samples will be <br /> analyzed for gasoline range organics (GRO), benzene, toluene, ethylbenzene, total xylenes (BTEX), <br /> tertiary butyl alcohol (TBA), methyl tertiary butyl ether (MTBE), di-isopropyl ether (DIPS), ethyl <br /> tertiary butyl ether (ETBE), tertiary amyl methyl ether (TAME), 1,2-dlchloroethane (1,2-DCA), <br /> 1,2-dibromoethane (EDB), and ethanol using USEPA Method 82606 <br /> 3 Stratus will conduct bi-monthly site visits to monitor system performance, maintain equipment, and <br /> to collect compliance samples <br /> 4 Stratus will prepare and submit a source test report to SJVAPCD <br /> 5 Stratus will oversee the advancement of two additional offsite soil borings (B-41 and B-42), <br /> installation of four additional offsite monitoring wells (MW-10 through MW-13), and the destruction <br /> of offsite well VW-15 <br /> 6 Following completion of the soil borings and well installations, Stratus will prepare and submit a site <br /> assessment report to SJCPHSIEHD <br /> f <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling All Monitoring Wells= Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sampling Date March 15, 2004 <br /> Is Free Product(FP) Present on Site Yes <br /> FP Recovered This Quarter 14 gallons (MW-1) <br /> Cumulative FP Recovered to Date 185 gallons <br /> Approximate Depth to Groundwater 107 36 to 110 09 feet below ground surface (bgs) <br /> . Groundwater Flow Direction Southwest <br /> P\Bp-Arco for URS\6100\Quarcerly\20041Arco_6100_1Q04 doc STRATUS <br />