My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011935
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:30:38 AM
Creation date
5/5/2020 8:37:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011935
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> were relatively low (18 6 parts per million by volume on August 16, 2005), this well was disconnected and <br /> well MW-4 was connected for soil vapor extraction on August 22, 2005 <br /> Operation and Maintenance <br /> During first quarter 2006, Stratus conducted twelve site visits to verify the system operation, to optimize <br /> system performance, conduct routine maintenance, and to collect the required discharge samples <br /> Currently the SVE system is set-up to extract soil vapors from wells VW-1, VW-3, VW-4, VW-8, VW-14, <br /> MW-4, MW-8, and MW-9 The SVE system was observed to be non-operational on January 24, 2006, <br /> due to low propane The system was re-started on the same day after a propane re-fill The SVE system <br /> was observed to be non-operational on February 14, 2006, due to the air pressure alarm Based on the <br /> hour meter readings for January 27 and February 14, 2006, the SVE system was likely shutdown on <br /> January 28, 2006 The SVE system was re-started on February 14, 2006, by adjusting the influent air flow <br /> rate The SVE system was again found to be non-operational on March 21, 2006, due to low propane <br /> Based on the hour meter readings for March 15 and 21, 2006, the SVE system was likely shutdown on <br /> March 20, 2006 The SVE system was re-started on March 23, 2006, after re-filling the propane tank <br /> During the first quarter 2006 (between December 21, 2005 and March 28, 2006), the SVE system <br /> operated for 1,884 9 hours with an average operational uptime efficiency of 82 percent The GRO and <br /> benzene concentrations in the influent air samples collected during first quarter 2006 were in the range of <br /> 6,000 to 15,000 Mg/M3 and 34 to 210 mg/m3, respectively The average system Influent airflow rate to the <br /> SVE system was observed at 292 67 cfm at an average applied vacuum of 100 49 inches of water <br /> column During the first quarter 2006 (between December 7, 2005 and March 1, 2006), approximately <br /> 37,843 82 pounds of GRO were extracted and abated by the SVE system A cumulative mass of <br /> approximately 77,507 47 lbs (Figure 6) of GRO has been removed from the subsurface by both the two <br /> 200 cfm (previously operated) and the current 500 cfm SVE systems The SVE system is operating as <br /> designed and is in compliance with the SJVPACD permit requirements <br /> ATTACHMENTS <br /> • Table 1 Product Monitoring and Removal Summary <br /> • Table 2 Groundwater Level Data <br /> • Table 3 Groundwater Analytical Summary <br /> • Table 4 Groundwater Analytical Results for Oxygenates and Additional Compounds <br /> • Table 5 Summary of Wells <br /> • Table 6 Flow Rates and Analytical Results of Air Sample Analyses <br /> • Table 7 Operational Uptime and Flow Rate for SVE System <br /> • Table 8 Extraction and Emission Rates <br /> • Figure 1 Site Location Map <br /> • Figure 2 Site Plan <br /> • Figure 3 Groundwater Elevation Contour Map, Upper Water Bearing Zone (1st Quarter 2006) <br /> Figure 4 Groundwater Elevation Contour Map, Lower Water Bearing Zone (1st Quarter 2006) <br /> Figure 5 Groundwater Analytical Summary(First Quarter 2006) <br /> • Figure 6 Influent GRO Concentrations in Soil Vapors and Cumulative GRO Mass Removed <br /> Over Time <br /> • Appendix A Field Data Sheets <br /> • Appendix B Sampling and Analysis Procedures <br /> • Appendix C Certified Analytical Reports with Chain-of-Custody Documentation and EDF <br /> Verification <br /> • Appendix D Performance and Operation Summary of King, Buck, & Associates SVE Systems <br /> K 1Bp-Arco for URS161001Quarterly120061Arco 6100_1 Q06 doc STRATUS <br />
The URL can be used to link to this page
Your browser does not support the video tag.