My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011938
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:45:09 AM
Creation date
5/5/2020 8:39:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011938
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOG OF EXPLORATORY BORING <br /> PROJECT NUMBER 0805-15203 BORING NO VW-18 <br /> PROJECT NAME ARCO Products Company Service Station No. 6100 PAGE 2 OF 4 <br /> BY D. Foley DATE 6/26/95 SURFACE ELEV NA ft. <br /> RECOVERY FID PENETRA- U) LITHO- WELL <br /> TION ZwJ J GRAPHIC DESCRIPTION DETAIL <br /> �¢Ld COLUMN <br /> (ftift) (ppm) (blwslft) 9J N <br /> 1 411 5 00 SILT(ML), continued <br /> 37 <br /> 1 111 5 00 @22 5' as above, no hydrocarbon odor <br /> 77 <br /> 1 011 5 00 25 @25' as above, 5% fine-grained sand, no <br /> hydrocarbon odor <br /> 54 <br /> • <br /> 06/10 0 0 30 @30' as above, 100% low plasticity fines, dry, no <br /> 69 hydrocarbon odor <br /> 05/08 0 0 35 @35' as above, light gray (2 5Y, 7/2), dry, no <br /> 85/0 8 hydrocarbon odor <br /> 1-40 <br /> . REMARKS <br /> Boring drilled using 8-inch diameter continuous-flight,hollow-stem auger drilling equipment and sampled with a <br /> modified California split-spoon sampler Boring converted to a 4-inch diameter vapor extraction well See Well Details <br /> sheet for well construction information <br /> E ON <br />
The URL can be used to link to this page
Your browser does not support the video tag.