My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011938
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:45:09 AM
Creation date
5/5/2020 8:39:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011938
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Conceptual Model October 3,2002 <br /> ARCO Faciltty No 6100 <br /> 3 SUMMARY OF SITE ASSESSMENT ACTIVITIES <br /> Assessment of petroleum hydrocarbon impact was initiated in June 1990 Several consultants <br /> have been involved in environmental investigations at this site The following is a brief <br /> summary of assessment activities conducted to date at the site Locations of all soil borings and <br /> wells are included on Figure 2 <br /> • Applied GeoSystems installed borings B-1 through B-5 between June 6 and 8, 1990 <br /> • The USTs were replaced in November 1990 Roux Associates, Inc collected soil <br /> samples from the UST pit between November 7 and 28, 1990 <br /> • Resna drilled borings B-6 through B-11 between October 7 and 11, 1991 Four of the <br /> borings were completed as vapor wells VW-1 through VW-4 <br /> • Resna drilled borings B-12 through B-19 between November 20 and 27, 1991 Five of <br /> the borings were completed as vapor wells VW-5 through VW-9 <br /> • Resna drilled borings B-20 through B-25 between June 1 and 3, 1992 These borings <br /> were completed as vapor wells VW-10 through VW-15 <br /> • Resna drilled bonngs B-26 through B-28 between December 15 and 22, 1992 Two of <br /> these borings were completed as vapor wells VW-16 and VW-17 <br /> • EMCON installed wells VW-18, VW-19, and VW-20 between June 26 and July 5, 1995 <br /> • Delta drilled boring B-32 and constructed monitoring well MW-1 to this boring between <br /> August 24 and 30, 2000 <br /> • Delta drilled borings B-33 through B-38 between August 29 and September 7, 2001 <br /> • Delta installed wells MW-2 through MW-9 between September 10 and 25, 2001 <br /> • The dispensers and product piping were replaced during the first quarter 2002 Delta <br /> collected compliance soil samples between January 18 and February 11, 2002 <br /> Boring depths and well construction details are summarized in Appendix A Soil analytical data <br /> from the UST removal and product piping activities are included in Appendix B <br /> • <br /> P 1Bp-Arco for URS161001Reports16100 SCM doc Page 4 Stratus <br />
The URL can be used to link to this page
Your browser does not support the video tag.