Laserfiche WebLink
Service Station #6100 <br /> QMR & QRPS 2Q06 <br /> August 31, 2006 <br /> • Page 7 <br /> ADDENDUMS <br /> Figure 1 — Site Location Map <br /> Figure 2 — Site Plan <br /> Figure 3 — Groundwater Elevation Contour Map <br /> Figure 4 — Groundwater Elevation Contour Map (Shallow) <br /> Figure 5—Groundwater Hydrocarbon Concentration Map (Deep) <br /> Figure 6— Influent GRO Concentrations and Cumulative GRO Mass Removed (Current and <br /> Former SVE Systems) versus Time <br /> Figure 7— Influent Benzene Concentrations and Cumulative Benzene Mass Removed (Current <br /> SVE System) versus Time <br /> Table 1 — Groundwater Elevation and Analytical Data <br /> Table 2— Fuel Oxygenates Analytical Data <br /> Table 3— Groundwater Gradient Table <br /> Table 4—Well Construction Details <br /> Table 5—Vapor Extraction Operation Summary <br /> Table 6 —Vapor Extraction Analytical Data Summary <br /> Table 7—Vapor Extraction Performance Summary <br /> Attachment A— Previous Investigations and Site History Summary <br /> Attachment B— Stratus Groundwater Sampling Data Package <br /> Attachment C — Certified Laboratory Analytical Report and Chain-of-Custody Documentation for <br /> Quarterly Monitoring <br /> Attachment D — System O&M Data Packages <br /> Attachment E — Certified Laboratory Analytical Report and Chain-of-Custody Documentation for <br /> Treatment System O&M <br /> I IBP-ARCM04 BP Valley Portfolio161001Reports\QMRs16100 2Q2006 doc SECOR International incorporated <br />