My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011940
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011940
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:42:15 AM
Creation date
5/5/2020 8:41:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011940
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 0 REMEDIAL ACTIONS <br /> 4.1 Soil Excavation and Removal <br /> An unknown quantity of soil was excavated and removed from the site during the UST <br /> replacement activities in November 1990 Delta oversaw the excavation and removal of <br /> approximately 315 tons of petroleum hydrocarbon impacted soil from beneath the former <br /> product dispensers and product piping trenches on January 23, 2002 <br /> 42 Free Product Removal <br /> Removal of free product at the site was initiated in September 2000, shortly following the <br /> installation of well MW-1 Approximately 207 gallons (MW-1), 14 gallons (VW-1), 20 gallons <br /> (VW-4), 2 gallons (MW-4), and 44 gallons (MW-15) of free product/groundwater mixture have <br /> been manually removed from the subsurface <br /> 4.3 Soil Vapor Extraction <br /> Continuous soil vapor extraction (SVE) was completed at the site between March and November <br /> 2004, using two 200 cfm King, Buck & Associates, Inc electric catalytic oxidizers equipped <br /> with 7 5 horsepower blowers The electric catalytic oxidizers were replaced with a Solleco 500 <br /> cfm thermal oxidizer in May 2005 Soil vapors are currently being extracted from wells VW-1, <br /> VW-3, VW-4, VW-8, VW-14, MW-4, MW-8, and MW-9 Lateral conveyance piping has been <br /> connected to wells VW-1, VW-3, VW-4, VW-6 through VW-9, VW-11 through VW-14, <br /> VW-16, and MW-2 through MW-9 High concentrations of GRO and BTEX constituents are <br /> currently being extracted from the subsurface As of March 1, 2006, an estimated cumulative <br /> mass of 77,507 pounds of GRO has been removed from the subsurface using SVE A map <br /> illustrating the configuration of the lateral conveyance piping, additional information regarding <br /> the SVE system, historical analytical data associated with SVE, and historical SVE equipment <br /> operational data are presented in Appendix H <br /> K VBp Arco for❑R5W OMReports16100 assessment rpt&scm update doc Page 12 STRATU5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.