Laserfiche WebLink
. pounds of GRO has been removed from the subsurface beneath the site by both the units The <br /> destruction efficiency of both the SVE systems for GRO was observed to be at or greater than 95% The <br /> SVE system is operating as designed and is in compliance with the SJVAPCD permit requirements <br /> ATTACHMENTS <br /> • Table 1 Product Monitoring and Removal Summary <br /> • Table 2 Groundwater Level Data <br /> • Table 3 Groundwater Analytical Summary <br /> • Table 4 Groundwater Analytical Results for Oxygenates and Additional Compounds <br /> • Table 5 Summary of Wells <br /> • Table 6 Flow Rates and Analytical Results of Air Sample Analyses— Unit 1 (SL No 9321) <br /> • Table 7 Flow Rates and Analytical Results of Air Sample Analyses— Unit 2 (SL No 9230) <br /> • Table 8 Operational Uptime and Flow Rate For Soil Vapor and Extraction System <br /> Unit 1 (SL No 9321) <br /> • Table 9 Operational Uptime and Flow Rate For Soil Vapor and Extraction System <br /> Unit 2 (SL No 9230) <br /> • Table 10 Extraction and Emission Rates— Unit 1 (SL No 9321) <br /> • Table 11 Extraction and Emission Rates—Unit 2 (SL No 9230) <br /> • Figure 1 Site Location Map <br /> • Figure 2 Site Plan <br /> • Figure 3 Groundwater Elevation Contour Map, Upper Water Bearing Zone (3rd Quarter 2004) <br /> • Figure 4 Groundwater Elevation Contour Map, Lower Water Bearing Zone (3rd Quarter 2004) <br /> • Figure 5 Groundwater Analytical Summary (Third Quarter 2004) <br /> • Figure 6 Influent GRO and Cumulative GRO Mass Removed Over Time—SVE Unit 1 <br /> M • Figure 7 Influent GRO and Cumulative GRO Mass Removed Over Time—SVE Unit 2 <br /> • Appendix A Field Data Sheets <br /> • Appendix B Sampling and Analysis Procedures <br /> • Appendix C Certified Analytical Reports with Chain-of-Custody Documentation and EDF <br /> Verification <br /> P 113p-Arco for URS16I001Quarterl}A20041Arco_61 OO_3QO4 doc 5MAIV5 <br />