Laserfiche WebLink
TABLE 8 <br /> OPERATIONAL UPTIME AND FLOW RATE <br /> FOR SOIL VAPOR EXTRACTION SYSTEM-UNIT 1 (SL NO 9321) <br /> ARCO Facility No 6100 <br /> 25775 South Patterson Pass Road <br /> Tracy, California <br /> Date Hr Meter Flow Rate Vacuum I Influent jDays Between Sampling Cumulative Das Percent <br /> Reading sefin) WC PID my Total Das U ptime Total Das Uptime U hme <br /> 03/09/04 NM 19307 10 330 System start-up, collect samples and shutdown awaiting <br /> analytical results <br /> 03/15/04 NM 19973 10 180 Sy stem start-up upon SJVAPCD approyal <br /> 03/23/04 NM 19640 12 230 8 -- 6 -- -- <br /> 03/29/04 NM 40 10 262 6 -- 12 -- -- <br /> 04/05/04 NM 142 04 l0 783 7 -- 19 -- -- <br /> 04/12/04 NM 6657 10 707 7 -- 26 -- -- <br /> 04/19/04 0 306 25 ' 12 NM 7 33 <br /> 04/19/04 Install hour meter <br /> 04/26/04 170 9986 ' 10 362 7 7 40 402 100% <br /> 05/03/04 337 17759 10 380 7 7 47 47 100% <br /> 5/10/2004 3 504 NM NM NM 7 7 54 54 100% <br /> 05/17/04 5095 NM NM NM 7 0 61 54 100% <br /> 05/17/04 System re-started after replacing solid state relay <br /> 05/24/04 674 79 89 ' 12 159 7 7 68 61 100% <br /> 05/28/04 7732 9320 ' 12 123 4 4 72 65 100% <br /> 06/07/04 1,009 83 22 ' 14 168 10 10 82 75 100% <br /> 06/29/04 1,537 6657 17 141 22 22 104 97 100% <br /> 07/12/04 1,848 8322 11 212 13 13 117 110 100% <br /> 07/26/04 2,1857 16644 1 12 558 14 14 131 124 100% <br /> 08/02/04 2,3567 14979 1 10 NM 7 7 138 131 100% <br /> 08/16/04 2,6910 14647 ' 10 420 14 14 152 145 100% <br /> 08/23/04 2,8621 169 77 10 210 7 7 159 152 100% <br /> 08/30/04 3,0274 149 79 ° 10 398 7 7 166 159 100% <br /> 09/08/04 3,2462 176 42 ' 10 320 9 9 175 168 100% <br /> 9/30/20044 3,5668 NM NM NM 22 13 197 182 61% <br /> "WC- Inches water column <br /> scfm-Standard cubic feet per minute measured using guages calibrated to standard pressure and temperature <br /> M-Not measured <br /> 1 Includes dilution air flow rate <br /> Due to lack of hour-meter data prior to this and based on field notes,this value is estimated <br /> System shutdown to replace solid state relay <br /> System shutdown due to heating element malfunction System to be re-started after replacing heating element <br /> ARCO-6100-O&M Page I of I 5TRAW5 <br />