. WORK PERFORMED THIS QUARTER(First 2005) <br /> 1 Stratus conducted two site visits during the first quarter 2005 to complete plumbing between the <br /> piping manifold and the newly installed Solleco 500 cfm thermal oxidizer <br /> 2 Stratus prepared and submitted an authority to construct (ATC) application (dated January 11, <br /> 2005) for the new Solleco 500 cfm thermal oxidizer to San Joaquin Valley Air Pollution District <br /> 3 Stratus retained an electrical contractor during February 2005 to make connections between the <br /> existing electric distribution panel and the control panel of the thermal oxidizer This work was <br /> completed during March 2005 <br /> 4 Stratus received an ATC (dated February 7, 2005) from SJVAPCD authorizing the start-up of the <br /> newly installed Solleco 500 cfm thermal oxidizer <br /> 5 Stratus retained a propane vendor to install a 500-gallon propane tank and to provide propane <br /> service required for the operation of the thermal oxidizer <br /> 6 Stratus monitored all vapor extraction and monitoring wells for the presence of water and free <br /> product on March 14, 2005 Groundwater samples were collected on March 15, 2005 from wells <br /> MW-2, MW-8, MW-10, MW-12, MW-13, VW-2, VW-3, VW-5, VW-6, and the domestic well <br /> Wells MW-1, VW-1, and VW4 had a sheen and were not sampled Well MW-15 was not <br /> sampled due to the presence of floating product Two gallons of product/water mixture were <br /> manually bailed from well MW-15 The other vapor and monitoring wells were either dry or could <br /> not be sampled due to poor well recovery <br /> • 7 Stratus compiled and evaluated the first quarter 2005 monitoring and sampling data <br /> WORK PROPOSED FOR NEXT QUARTER (Second 2005) <br /> 1 Stratus will continue to remove floating product periodically, if present, from wells MW-1, MW-15, <br /> VW-1, and VW-4 <br /> 2 The next sampling event is tentatively scheduled for June 2005 Groundwater samples will be <br /> analyzed for gasoline range organics (GRO), benzene, toluene, ethylbenzene, total xylenes (BTEX), <br /> tertiary butyl alcohol (TBA), methyl tertiary butyl ether (MTBE), di-isopropyl ether (DIPE), ethyl <br /> tertiary butyl ether (ETBE), tertiary amyl methyl ether (TAME), 1,2-dichloroethane (1,2-DCA), <br /> 1,2-dibromoethane (EDB), and ethanol using USEPA Method 8260B <br /> 3 Stratus will conduct start-up operations of the Solleco 500 cfm thermal oxidizer during third week of <br /> April 2005 <br /> 4 After initiating operation of thermal oxidizer, Stratus will conduct bi-monthly site visits to monitor <br /> system performance, maintain equipment, and to collect compliance samples <br /> Current Phase of Project Monitoring 1 Remediation <br /> Frequency of Groundwater Sampling All Monitoring Wells=Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sampling Date March 15, 2005 <br /> Is Free Product(FP)Present on Site Yes (sheen at MW-1, VW-1, and VW-4 and FP at MW-15) <br /> . FP Recovered This Quarter 2 gallons <br /> K 1Bp-Arco for URS16I001Quartcr1y120051Arco_6100_1 Q05 doc 5rPAIV5 <br />