My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2900 - Site Mitigation Program
>
PR0543479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:58:34 AM
Creation date
5/5/2020 9:11:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543479
PE
2960
FACILITY_ID
FA0024679
FACILITY_NAME
CANEPA'S CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
081360030
CURRENT_STATUS
01
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
613
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct 11 2001 10 ; 26AM CONDO, EARTH TECHNOLOGIES <br /> No - 6747 P . 3 / 14 <br /> CanOpa's Car Wash <br /> Mr, Jeff Wong - Deep Well screms <br /> October 10, 2001 <br /> horizon may be questionable. it is possible that the middle horizon sample contamination was the result <br /> of cross-contamination from more shallow horizons or laboratory error. If contamination was present in <br /> the middle horizon it is reasonable that the shallower horizon would have had contamination too, possibly <br /> at a higher concentration- Based on these results, Condor is proposing the construction of only one deep <br /> well in the center of the plume (in the vicinity of HPI through HP3) that would be developed and sampled <br /> quarterly for confirmation of the HP2 results. The proposed deep well will be screened in the middle <br /> horizon (from 100 to 110 feet bgs)_ If the monitoring of the proposed deep well indicates that the horizon <br /> investigated is not contaminated, the vertical portion of the site investigation should be complete. If the <br /> monitoring of the proposed deep well indicates the presence of contamination, additional deep monitor <br /> wells may be necessary in a subsequent phase of groundwater investigation. <br /> in addition to the map showing the approximate CPT boring locations, attached are the CPT logs and the <br /> laboratory analytical results. Because deep well installation is scheduled to begin on Monday, October <br /> 15, we will follow this letter with a phone call (or meeting if you prefer) to discuss the proposed deep <br /> well- <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> Don ICresse, R.G. <br /> Project Manager <br /> Attachments: Figure with CPT Boring Locations <br /> Laboratory Analytical Results <br /> CPT Boring Logs <br /> cc: Mr. Remo Canepa, Canepas Car Wash <br /> \\Pde\projects\1707 Canepa-Pacific\Conespondencc\30-10-01 1-Wong.doc <br /> as <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.