My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2900 - Site Mitigation Program
>
PR0543479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:58:34 AM
Creation date
5/5/2020 9:11:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543479
PE
2960
FACILITY_ID
FA0024679
FACILITY_NAME
CANEPA'S CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
081360030
CURRENT_STATUS
01
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
613
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> BILLING REVIEW - SOIL AND GROUNDWATER INVESTIGATION <br /> Canepa s Car Wash <br /> Stockton, CA <br /> Date: July 14, 1998 Client: Canepa s Car Wash <br /> Prepared by Dave Meade Site: 6230 Pacfic St., Stockton, CA <br /> ITEM COST/ UNIT UNIT TOTAL COST HANDLING SUBTOTALS Darr mvoiu <br /> TASK 1 -PREPARE FOR FIELD WORK: <br /> Permits, USA site. Pro). Review srzarge 82444 <br /> � <br /> Staff Geologist $72.50 /hr (a 1 $77.50 �ti • <br /> � Staft Geologist $72.50 /hr 1 .5 $108.75 428198 87132 <br /> Staff Geologist $72.50 /hr 6.5 $471 .25 5120/98 22532 <br /> ✓San Joaquin Permits $88.00 /each 1 $102.35 52n)`98 22532 <br /> Mice Support $27.50 fir 0.25 $6.88 5120/98 22532 <br /> Vehicle $45.00 /day 0.50 $22.50 $784.23 520/98 22532 <br /> TASK 2 - BORINGS • SOIL & GROUNDWATER SAMPLING: <br /> Install 2 boring to 70 R. bgs - Contiuous care, up to 3 Simulprobe soil and groundwater samples from each boring <br /> Spectrum Exploration• $5,749.50 /each 1 $5,749.50 <br /> Concrete Cutting 120/98 22532 <br /> Senior Technician $50.00 / hr 3 $150 00 <br /> Vehicle $45.00 /day 1 $45.00 520/98 22532 <br /> Supplies <br /> $13.63 /each 1 $15.67 520198 22532 <br /> Drilling <br /> Staff Geologist $72.50 / hr 32.5 $2,35625 520/98 22532 <br /> Vehicle $45.00 /day 2 $90.00 520/98 22532 _ <br /> Bailer $9.00 leach 1 $9.00 520198 22532 <br /> PID $65.00 /day 2 $130.00 5/20/98 22532 <br /> Deionized Water $1025 leach 2 $20.50 5/20199 22532 <br /> Sail Sample Kit $20.00 /day 2 $40.00 $8,605.9221 520198 22532 <br /> TASK 3 - LABORATORY ANALYSIS (SOIL AND GROUNDWATER)- U �N 1, <br /> Soil Analysis - <br /> TPH-G / BTEXIMTBE $55.00 leach 14 $770.00 $115.50 <br /> oxygenates/Additives (Total) $155.00 /each 44 $620.00 $9300 $1 ,598.50 622198 22796 <br /> Groundwater Analysis - <br /> TPH-G / BTEX /MTBE $55.00 leach 6 $330.00 $49.50 <br /> Oxygenates/Additives" $155.00 /each $620.00 $93.00 $1 ,092.50 622198 22196 <br /> kD S�9 -Z.) <br /> TASK 4 - INVESTIGATION REPORT: <br /> Staff Geologist $72.50 /hr 5 $362.50 5131/98 22628 <br /> Staff Geologist $72.50 /hr 11 .5 $833.75 622/98 22796 <br /> Draftsperson $57.50 /hr 8 $460.00 622/98 22796 <br /> Office Support $27. 50 /hr 1 $27 .50 6/22198 22196 <br /> Staff Geologist $72.50 /hr 7 $507.50 6130/98 22844 <br /> Draftsperson $57.50 /hr 4 $230.00 6/30199 22944 <br /> Registered Geologist $87.50 /hr 2 $175.00 $2596.25 6130198 22944 <br /> ioo ) •/Lz <br /> TOTAL BILLED: $13,584.90 <br /> L4 <br /> I Q, L4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.