Laserfiche WebLink
DEC- 02-94 FRI 15 , 54 SAN . J0 <br /> AQUIN VALLEY APCD FAX N0, 209 545 8652 P. 18 <br /> RECON)RECOM <br /> .MENDATIONSM <br /> Issue Authority to Construct subject to conditions to assure compliance with all <br /> applicable rules and regulations. <br /> CONDITIONSt <br /> 1 . (15) No air contaminant shall be discharger) into the atmosphere for a period or periods <br /> aggregating more than 3 minutes in any one hour which is as dark as or darker than <br /> Ringelmann I or equivalent 20% opacity. <br /> 2. (11$) No air contaminant shall be released into the atmosphere which causes a public <br /> nuisance. <br /> 3 . The soil decontamination system shall be maintained in proper working order at all times. <br /> 4 . All intake and exhaust leaks shall be repaired immediately. <br /> 5 . The overall hydrocarbon captureldestruction efficiency of Omni Systems soil remediation <br /> equipment (model 17PRV) , shall not be less than 95 % at any time. <br /> 61 Total influent hydrocarbon concentration into the Omni Systems soil remediation <br /> equipment (model 17PkV), shall not exceed 2,823 ppm. <br /> 7. Total effluent hydrocarbon concentration in the exhaust from the Omni Systems soil <br /> remediation equipment (model 17PRV), shall not exceed 141 ppm. <br /> 8 . Only propane shall be used as the auxiliary fuel for the burning of gasoline vapors. <br /> 4 . Total emissions from the Omni Svstemc q,,,i *an•x&4' ation equipment (model 17PRV), <br /> shall not exceed the folic _ t day. NOY = 0.51bs/day; CO = <br /> 10.4 lbs/day; SOX = 0. -�, � Uny and HC(Nonmethane) _ 8. 2 <br /> lbsiday. Vp" <br /> 10. The annual emissions ofdl emissions units associated with <br /> decontamination project Per year. <br /> 11 , The permittee shall make viuvimuua aur iauoratory samples to be taken at the time of the <br /> initial inspection under the supervision of the Air Pollution Control Inspector. Samples <br /> shall be taken at locations both upstream and downstream of the system , <br />