Work Plan for Monitor Well Clw,ae and Monitor Well Installation <br /> Canepa's (Pacific) Car Wash <br /> Page 3 <br /> will be placed at the bottom of the screen. Blank PVC casing will be installed above the screen to <br /> the ground surface. The well casing will be steam-cleaned on site prior to use. No glue or <br /> solvents will be used in the construction of the well. <br /> A sand pack of #3 Monterey sand will be placed in the annular space to approximately one foot <br /> above the screen. Approximately two feet of bentonite pellets will be placed above the sand to <br /> form a protective seal. The bentonite will be hydrated using potable water. A seal of neat cement <br /> will be poured in the annulus from the bentonite seal to the ground surface and a locking traffic <br /> box will be installed at the ground surface. The proposed well design is shown in Figure 3, <br /> attached. <br /> Condor's licensed land surveyor will determine the location and elevation of the well collar <br /> following the installation of the monitor well, relative to the other site monitor wells. The well <br /> collar will be surveyed with a vertical accuracy of 0 .01 foot and horizontal accuracy of 1 .0 foot. <br /> The measuring point for water-level measurements will be marked on the well collar. <br /> At least 48 hours following construction, the monitor well will be developed by surging and <br /> bailing the groundwater in the well until the discharge water is free of sediment (clear to the <br /> unaided eye). The monitor well will be purged until the temperature, electrical conductivity and <br /> pH of the water has stabilized. All well-development equipment will be cleaned prior to use in the <br /> well by washing in a solution of laboratory-grade, non-phosphate detergent and hydrocarbon-free <br /> water, and double rinsing with hydrocarbon-free water. The purge water discharged from the well <br /> during development will be placed in 55-gallon drums, sealed, labeled, and left on site to await <br /> disposal. <br /> Monitor well MW43 will be sampled as part of the established quarterly groundwater monitoring <br /> program for the site. Sampling, water level monitoring, and laboratory analysis of the <br /> groundwater samples collected from MW-13 will be conducted in accordance with the procedures <br /> established for the quarterly groundwater monitoring program. <br /> Condor will prepare a brief monitor well installation and destruction report for submittal to the <br /> SJCEHD . The report will include a discussion of the field procedures used to conduct the work, a <br /> discussion and presentation of the subsurface lithology, and recommendations. A draft of the <br /> report will be presented to the property owner for approval prior to submittal of the final report. <br /> Upon approval of this Work Plan by the City of Stockton and the SJCEHD, the approval of the <br /> Client to proceed, notification of adjacent property owner (required in the City of Stockton <br /> permit), and pre-approval of the project cost by the UST Fund, the proposed fieldwork described <br /> above can be completed within approximately two to four weeks. Pre-approval of the project <br /> costs by the UST Fund will require concurrence from SJCEHD (in the form of approval of this <br /> work plan in a letter) . Therefore, Condor, on behalf of Remo Canepa, respectfully requests timely <br /> consideration of this work plan. <br /> L <br /> ILA CONDOR <br />