Laserfiche WebLink
I <br /> Work Plan <br /> Canepa's Car Wash <br /> November 17, 1998 <br /> Page S- <br /> �� TABLE 1 <br /> - II Analytical Methods <br /> _ J <br /> CONSTITUENT METHOD DETECTION LIMIT <br /> Soil <br /> BTEX, MTBE 8020 5.0 µg/kg (BTEX) <br /> 10.0 gg/kg (MTBE) <br /> - - TPH-G 5030/LUFT I .O mg/kg <br /> Groundwater <br /> BTEX 602 0.3 gg/1 (BTE) <br /> _ 0.6 µgIl (X) <br /> TPH-G 5030/LUFT 0.05 mg/1 <br /> Gasoline Additives/Oxygenates 8260 1 .0 µg/1 <br /> 10 µg/1 for tertiary Butanol <br /> 1 <br /> _1 4. INVESTIGATION REPORT <br /> A Soil and Groundwater Investigation Report will be prepared for submittal to the PHS/EHD. At a <br /> minimum the report will include: ( 1) a discussion of the site history, (2) a description of the fieldwork <br /> __J conducted at the site, (3) the laboratory results, (4) a scaled site plan, (5) drilling logs, (6) conclusions, <br /> and (7) recommendations. <br /> �. SCHEDULE <br /> Upon approval of this work plan by the PHS/EHD, pre-approval from the California UST Clean-up <br /> Fund, and notification from Canepa's Car Wash to proceed, Condor can conduct the fieldwork described <br /> in this work plan within three weeks. Standard turn-around-time for laboratory analyses is two weeks. <br /> Jl Upon receipt of the laboratory results, Condor can submit a draft copy to Client for review and comment <br /> within three weeks. If you have any questions or require additional information, please call Dave Meade <br /> at (209) 234-0518 . <br /> J`I <br /> � L6 <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. 0J'�4 - <br /> '� CONALD F RESSE <br /> N0. 6430 Ir <br /> R. David Meade " J� ��� ' Donald F. Kresse <br /> Sr. Project Manager ; California Registered <br /> CAO Geologist 46430 <br /> PAI 707 Canepa-PacifickWork Plans\Canepa Pacific Work Plan.doc <br /> ` � CONDOR <br />