Laserfiche WebLink
- CONTINUED CONDITIONS FOR N-3039-1-0 Page 2 <br /> 8 - Total emissions from the Omni Systems soil remediation equipment (model 17PRV), shall not exceed the <br /> following limits during any singgle day NOx = 0 S lbs/day, CO = 10 4 lbs/day, Sox = 0 1 lbs/day, PM10 <br /> = 0 2 lbs/day and HC(Nonmethane) — 8 2 lbs/day <br />' 9 - The annual emissions of any affected pollutant from all emissions units associated with <br /> decontamination project shall not exceed (2) two tons per year <br /> 10The permittee shall make provisions for laboratory samples to be taken at the time of the initial <br /> Inspection under the supervision of the Air Pollution Control Inspector Samples shall be taken at <br /> locations both upstream and downstream of the system <br /> I 11 - Samples shall be analyzed for TPH and BTEX FID readings shall be taken from the same sampling ports <br /> immediately following the laboratory samples Laboratory results shall be received by the District <br /> prior to commencing system operation <br />' 12 - The influent hydrocabon concentration and emissions from the Omni Systems soil remediation <br /> equipment(model 17PRV), shall be measured three times a day for at least 15 minutes for each <br /> sampling, _ days a week for the first month and weekly thereafter <br />' 13 - A weekly log indicating the measured daily, weekly and cumulative influent hydrocarbon concentrations <br /> and emissions shall be maintained and made available for District inspection upon request <br />' 14 - A weekly log indicating the operating hours of the soil decontamination system and fuel usage shall <br /> be kept on the premises and shall be made available for District inspection upon request <br /> i <br /> 1 <br /> 1 <br /> 1 <br />