Laserfiche WebLink
1 <br /> Site Heston <br /> Canepa's Car Wash(Pacific Avenue) <br />' Page—2- <br /> Ili-nits from 20 feet bgs to the capillary ftnnge A summary of the soil and groundwater analytical data is <br />' contained in Inter rm Stains Repoi t Phase H Investigation, by WHF Based on the initial data, the vertical <br /> and lateral limits of contamination were not sufficiently defined WHF proposed the installation of four(4) <br /> additional monitor wells (MW-5 tluough MW-8) to fully characterize the groundwater plume The <br />' PHS/EHD gianted approval of the additional investigation on January 19, 1994 Between March 9 and 11, <br /> 1994, WTD' installed MW-5 through MW-8 TPH-G was detected in the soil sample collected frons MW-6 <br /> at 50 and 55 feet bgs and from MW-7 at 50 feet bgs TPH-G and BTEX were detected in groundwater <br />' samples collected from MW-6, MW-7, and MW-8 A summary of the soil and groundwater analytical data <br /> is c,ontamed in Phase H Stte Chmacter-rzatron, by WHF The wells were surveyed and groundwater <br /> elevation measurements indicated that a groundwater mound existed beneath the site This suggested that <br />' recharge or leakage into the groundwater in the vicinity of MWA and MW-2 was occurring Three <br /> potential sources of recharge were identified 1)the car wash water recycling pit systenn under the building, <br /> 2) a leaking or broken sewer line that crosses the area, and 3) a leaking water supply line An MBAS <br /> (Methyl Blue Active Surfactants) test was eoiiduc.ted on groundwater samples collected at the site in July, <br /> 1994, to investigate the piesence of detergents MBAS was not detected in the samples <br /> Aquifer testing(24-hour pump test)was conducted at the site by WI4P on December 22 and 23, 1994 MW- <br /> 1 was used as a pumpiing well, and MW-4, MW-6, MW-7, and MW-8 were used as observation wells The <br /> results indicated an optimum pumping rate of 5 gpm with an effective radius of 140 feet Aquifer <br /> permeability was estimated at 126 gpd/ft2 <br /> Quarterly groundwater monitoring was conducted at the site by WHF from March, 1994, through June, <br /> 1995 Historical gioundwatei analytical data indicated elevated concentrations of TPH-G and BTEX in <br />' MW-1, MW-2, MW-6, and MW-7 Low concentrations of TPH-G and BTEX were detected in MW-3, <br /> MW-4, MW-5 and MW-8 Condor has been conducting quarterly groundwater monitoring at the site since <br /> August, 1996 Analysis of groundwater samples collected from selected SVE wells (SVE-1, 2, 3, 5, 7, 8, <br /> and 9) indicate that high concentrations of lPH-G BTEX, and MTBE are present in the former location of <br /> the fuel dispenser islands The groundwater table has risen approximately 18 5 feet since quarterly <br /> monitoi ing of all eight site monitoi wells began in March, 1994 <br /> IA site investigation was conducted by Condor Earth Technologies, Inc (Condor) on July 31, 1996, at the <br /> Canepa's Car Wash facility The investigation included a review of existing investigative reports and an <br /> I evaluation of the existing SVE system located at the site The fieldwork was conducted in accordance with <br /> Condor's proposal for SVE evaluation,dated April 8, 1996, and the addendum to the proposal, dated May 2, <br /> 1996 The subsequent report was titled Soil Vapor Extraction (SVE) System Elaluatron, dated September <br /> 2-3, 1996 <br /> Based on the soil analytical data available for the site, Condor estimated that the volume of hydrocarbons <br /> present in the soil beneath the site i4 approximately 13,000 pounds or 2 050-gallons (6 34 lbs/gal) Due to <br /> unknown variations in the hthology and contaminant concentrations, the actual volume of hydrocarbon <br /> beneath the site may vary by an order of magnitude or more from the estimate <br /> Ba-ed on the results of the SVE system e%aluation and site background Condor recommended that - <br /> operation of the ICU be suspended since the system slid not appear to meet APCD permit conditions (i e, <br /> 95% destruction effieienc,y) Condor further recommended that a 150 SCFM catalytic oxidation unit(CAI- <br /> I OX) be installed at the site to c\tract and tical the gasoline, contamination in the vadose zone It was <br />