Laserfiche WebLink
Idr <br /> FIGURE 4 -c HYDROGRAPH <br /> Z ra D O -tea Q O 015 <br /> Q '� ¢ O <br /> -200- - <br /> Appioximate elevation of top of <br /> screen for monitor wells MW-8 <br /> through 1u3YV 8 Well careen <br /> �I <br /> interval for MW 6 through WN 8 <br /> approximately 45 to 85 feet bgs <br /> 250z -250- <br /> z <br /> 0 -300- <br /> LU <br /> 30a LU <br /> W <br /> IU <br /> a <br /> 35Qz3 -350- <br /> z <br /> 0° <br /> Approximate elevation oftap of <br /> at top of screen for monitor wells <br /> MW t through MW5 Well <br /> 4QQ -- -- -- --- - -- --- screen interval for MWIthrough <br /> MW 5 approximately 50 to 70 <br /> feet bps <br /> -45 0 <br /> DATE (MONTH-YEAR) <br /> —N—MW-1 —)(--MW-2 -f--MW-3 —MW-4 0 MW-5 MW-6 -A--MW-7 MW-8 <br /> CANEPA'S CAR WASH <br /> PACIFIC AVENUE <br /> PROJECT NO 1707 <br />