Laserfiche WebLink
COST ESTIMATE WORKSHEET <br /> QUARTERLY GROUNDWATER MONITORING AND REPORTING <br /> If Canepa's Car Wash <br /> 6230 Pacific Avenue <br /> Stockton, CA <br /> iii ik <br /> Prepared B James Wack Job No.: 1707P <br /> Condor Earth Technologies, Inc. Date: April 8, 1996 <br /> ITEM COSTIUNIT UNIT COST HANDLING SUBTOTALS <br /> TASK 1; Quarterly Groundwater Monitoring WC11s)and Reportin <br /> Fieldwork <br /> Technician $52.50 /hr 14 5735.00 <br /> Vehicle 545.00 Ida 2 S90.00 <br /> Water Quality Kit $20.00 Ida 2 540.00 <br /> J <br /> DI Water(5-gal) $10.25 3 $30.75 <br /> Ij Disposable Baer $9.00 Ica 8 $72.00 <br /> Water Level Meter $20.00 Ida 2 $40.00 $1,007.75 <br /> Laboratory Analyses <br /> GW Analyses(8 wells plus I QA/QC)' $100.00 /Ca 9 $900.00 $135.00 $1,035.00 <br /> Quarterly Groundwater Report <br /> Geologist $72-50 Ihr 8 5580.00 <br /> Prof.Engineer/Reg,Geologist $87.50 /hr 1 $87.50 <br /> Draftperson(site plan,gradient etc.) $57.50 Air 3 $172.50 <br /> Office Support $27.50 Air 2 $55.00 $895.00 <br /> Estimated cost to conduct quarterly groundwater monitoring and report results per quarter: �7_75 <br /> Groundwater samples will be analyzed for BTEX,TPH-G.and MTBE. <br /> Work description-measure depth to groundwater in 8 monitor wells at the site,inspect initial bailer sample <br /> for floating product,sheen,odor,or discoloration,purge each well until pH,EC,and temperature stabilize(at least 3 casing volumes), <br /> collect groundwater sample(2 VOA's),label VONs,store VONs in cooler for delivery to laboratory,decontaminate all <br /> field equipment prior to use at each well(wash in HC free water and non-phosphate detergent,triple rinse with HC free water), <br /> secure and lock each well,complete chain of custody,daWer groundwater samples to laboratory,mob-demob. <br /> L <br /> �Canepa/CanepaQT.Wbi ii <br />