My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 4:20:49 PM
Creation date
5/5/2020 10:23:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r IL <br /> JOBSITE INSPECTION RECORD <br /> APPLICANT SHALL POST ON JOB SITE <br /> Request inspections online at https://aca.accela.com/stockton -OR-call the automated CITY OF <br /> phone line at (209) 937-8560 with permit number, three-digit inspection item number(s), M05STOCKTON <br /> and voice message for the inspector. Inspection requests made before 3:00 p.m. on a <br /> regular business day will be scheduled for the following regular working day. <br /> ADDRESS: _ BP NUMBER: <br /> 001 TEMPORARY APPROVED BY: 012 ELECTRICAL APPROVED BY: <br /> ELECTRICAL INSP:_ DATE: WIRING INSP: DATE: <br /> 002 SITE WORK APPROVED BY: 013 ELECTRICAL APPROVED BY- <br /> INSP: _ DATE:_� . I SERVICE/PANEL INSP: DATE: <br /> ❑ COMPACTION ❑ MOISTURE ❑ GROUNDING ❑ BONDING <br /> ❑ CONDITIONING ❑ POOL DEMOLITION PREP ❑ PANEL LABELING ❑ HEIGHT&CLEARANCE <br /> 'Re uired prior to Foundation inspection ❑ RELEASE <br /> 3 FOUNDATION APPROVED BY. <br /> INSP: DATE: <br /> _ 014 GAS SERVICE APPROVED BY: <br /> ❑ SET BACK ❑ FRAMING INSP: DATE: <br /> ❑ FOUNDATION FOOTING ❑ MECHANICAL ❑ PIPING ❑ BONDING <br /> ❑ WIRE/REBAR ❑ ELECTRICAL ❑ GAS TEST ❑ RELEASE <br /> ❑ PIERS ❑ PLUMBING <br /> ❑ LIFER ❑ ACCESS 015 ROOF APPROVED BY: <br /> ❑ HOLD DOWN ❑ INSULATION INSP: DATE: <br /> ❑ TEAR-OFF ❑ STRUCTURAL <br /> ❑ ROOF NAIL <br /> 'Do not pour concrete/back fill/subfloor until above is approved <br /> SHEAR&ROOF APPROVED-BY: SWIMMING POOL: APPROVED BY: <br /> INAILS INSP: _ _ DATE: 016 PRE-GUNITE INSP: DATE: <br /> ❑ FRAMING ❑ HOLD DOWNS <br /> ❑ SHEAR PANEL NAILING ❑ ROOF NAILING SWIMMING POOL: APPROVED BY: <br /> ❑ COLLECTORS/DRAG STRUTS 017 PRE-DECK INSP: DATE: <br /> 'Do nptcover work until above is aooroved <br /> FIRE SPRINKLER APPROVED BY: SWIMMING POOL: APPROVED BY: <br /> 5 ROUGH INSP: DATE: 018 PRE-PLASTER INSP:_ DATE: <br /> 'Final re uired-Pool not to be filled until Pre-plaster inspection is approved <br /> (06 FRAME ONLY APPROVED BY. 019 SPECIAL APPROVED BY- <br /> INSP: DATE: INSPECTION INSP: DATE: <br /> ❑ CONCRETE BOLTS INSTALLED IN CONCRETE <br /> APPROVED BY: ❑ RESISTING CONCRETE FRAME ❑ REINF.&PRESTRESS STEEL TENDONS <br /> 007 CLOSE-IN INSP: DATE: ❑ WELDING ❑ HIGH-STRENGTH BOLTING <br /> ❑ FRAMING MECHANICAL ❑ STRUCTURAL MASONRY ❑ REINFORCED GYPSUM CONCRETE <br /> ❑ ELECTRICAL ❑ PLUMBING ❑ INSULATING CONCRETE FILL ❑ SPRAY-APPLIED FIREPROOFING <br /> ❑ GAS PIPING/GAS TEST ❑ LATH ❑ PILIN,DRILLED PIERS&CAISSONS ❑ SHOTCRETE <br /> ❑ WINDOWS ❑ SHOWER PAN ❑ GRADING,EXCAVATION&FILLING ❑ SPECIAL CASES <br /> 'Do not cover work until above is approved ❑ EQUIPMENT 3RD PARTY CERT. <br /> 008 INSULATION APPROVED BY: <br /> INSP: DATE: FINAL PUBLIC APPROVER BY: <br /> WALL CEILING 020 WORKS INSP: DATE: <br /> 'Do not cover work until above is approved <br /> 009 SHEETROCK APPROVED BY: <br /> INSP: DATE: �21 FINAL FIRE APPROVED BY. <br /> ❑ FIREWALL-1ST LAYER SHEETROCK INSP: DATE: <br /> ❑ FIRE WALL-2ND LAYER <br /> 'Do not tape until above is approved <br /> 010 LATH/STUCCO APPROVED BY: 022 FINAL BUILDING' APPROVED BY: <br /> INSP: .DATE: _ 'Required for ALL permits INSP:_ DATE: <br /> WIRE/WEEP SCREED 1ST COAT SMOKE DETECTORS ❑ CARBON MONOXIDE DETECTORS <br /> SCRATCH COAT ❑ CEC REGS ❑ POOL <br /> ❑ INSULATION ❑ PLUMBING <br /> 011 ABOVE CEILING APPROVED BY: ❑ MECHANICAL ❑ ELECTRICAL <br /> INSP: — _ _ DATE: ❑ GAS SERVICE ❑ ROOF <br /> ❑ T-BAR ELECTRICAL ❑ PHOTOVOLTAIC ❑ POST FIRE INSPECTION <br /> ❑ MECHANICAL PLUMBING ❑ SPECIAL INSPECTION FINAL ❑ DEMOLITION <br /> ❑ FIRE SPRINKLER ROUGH APPROVED ❑ CERTIFICATE OF OCCUPANCY ❑ TCO <br /> 'Do not install ceiling tiles until above is approved <br /> The permit shall become void and work shall be considered abandoned if an inspection has not been recorded and approved within 180 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.