Laserfiche WebLink
Assembly of Field Rolled Fiber Roll <br /> M Roll length of erosion control blanket into a tube of minimum 200 mm (8 in) <br /> diameter. <br /> ■ Bind roll at each end and every 1.2 m (4 ft) along length of roll with jute-type <br /> twine. <br /> Installation <br /> ■ Slope inclination of 1:4 or flatter: fiber rolls shall be placed on slopes 6.0 m <br /> apart. <br /> ■ Slope inclination of 1:4 to 1:2: fiber rolls shall be placed on slopes 4.5 m <br /> apart. <br /> • Slope inclination 1:2 or greater: fiber rolls shall be placed on slopes 3.0 m <br /> apart. <br /> w Stake fiber rolls into a 50 to 100 mm (2 to 4 in)trench. <br /> rr Drive stakes at the end of each fiber roll and spaced 600 mm (2 ft) apart if <br /> Type 2 installation is used (refer to Page 4). Otherwise, space stakes 1.2 m <br /> (4 ft) maximum on center if installed as shown on Pages 5 and 6. <br /> ■ Use wood stakes with a nominal classification of 19 by 19 mm (3/4 by 3/4 in), <br /> and minimum length of 600 mm (24 in). <br /> ■ If more than one fiber roll is placed in a row, the rolls shall be overlapped; not <br /> abutted. <br /> Removal <br /> w Fiber rolls are typically left in place. <br /> a If fiber rolls are removed, collect and dispose of sediment accumulation, and <br /> fill and compact holes, trenches, depressions or any other ground disturbance <br /> to blend with adjacent ground. <br /> Maintenance and <br /> ■ Repair or replace split, torn, un r v ' o <br /> Inspection <br /> lnspAh <br /> e n s r rt m enan as needed or <br /> as rE.■ insplowing rainfall events and a least daily during prolonged <br /> rainfall. Perform maintenance as needed or as required by the RE. <br /> n Maintain fiber rolls to provide an adequate sediment holding capacity. <br /> Sediment shall be removed when the sediment accumulation reaches three <br /> quarters (3/4) of the barrier height. Removed sediment shall be incorporated <br /> in the project at locations designated by the RE or disposed of outside the <br /> highway right-of-way in conformance with the Standard Specifications. <br /> Page 4 of 4 <br />