My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:44:53 AM
Creation date
5/5/2020 10:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br /> r I <br /> f� <br /> Quarterly Summary Report <br /> Fourth Quarter 1998 1 <br /> Former Unocal Service Station 2859 <br /> 1665 Pacific Avenue <br /> Stockton, California <br /> County STID #: None <br /> County: San Joaquin <br /> BACKGROUND <br /> Underground storage tanks removed in March 1988. From March 1988 through <br /> November 1994, a total of 12 on-site and 3 off-site borings were drilled, 4 on-site moni- <br /> toring wells, 3 on-site soil vapor extraction (SVE)wells, and 5 off-site monitoring wells <br /> were installed. Analytical results indicate that soil near the eastern dispenser island <br /> contains gasoline hydrocarbons and groundwater has been impacted with gasoline <br /> hydrocarbons. A work plan to initiate a SVE pilot test was submitted on July 14, 1995. <br /> A 30-day public notification for air permitting was initiated, and an air permit to construct <br /> was received in December. The SVE remedial system was constructed in January 1996. <br /> The SVE pilot test was run from January through November 1996, during which time it <br /> removed nearly 2,800 pounds of hydrocarbons. <br /> RECENT QUARTER ACTIVITIES <br /> A work plan for delineating the vertical extent of hydrocarbons was submitted during this <br /> reporting period. Fourth quarter groundwater monitoring and sampling was also <br /> performed during this reporting period. <br /> I. <br /> NEXT QUARTER ACTIVITIES <br /> First quarter 1999 groundwater monitoring and sampling will be performed. Pending <br /> approval by San Joaquin County, the scope of work contained in the recently submitted <br /> work plan should be completed during first quarter 1999. <br /> t <br /> 3100405A/4Q98QSR 1 January 21, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.